Irrigation Engineering If L is total length of a canal in kilometers, P is total perimeter of its lining in metres and C is the cost of lining per square metre, the additional expenditure involved on lining, is PC/100L PL/1000C 100 PLC PLC/1000 PC/100L PL/1000C 100 PLC PLC/1000 ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering An aggrading river is a scouring river silting river neither silting nor scouring river both silting and scouring river scouring river silting river neither silting nor scouring river both silting and scouring river ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering In case of non-availability of space due to topography, the most suitable spillway is chute spillway shaft spillway ogee spillway straight drop spillway chute spillway shaft spillway ogee spillway straight drop spillway ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering The runoff increases with increase in infiltration capacity increase in intensity of rain All of these increase in permeability of soil increase in infiltration capacity increase in intensity of rain All of these increase in permeability of soil ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering Disposal of extra excavated earth of canals, is utilized to provide a spoil bank on All listed here Left side Both sides Right side All listed here Left side Both sides Right side ANSWER DOWNLOAD EXAMIANS APP
Irrigation Engineering If the critical shear stress of a channel is XC, then the average value of shear stress required to move the grain on the bank is 1.33 TC XC 0.5 XC 0.75 TC 1.33 TC XC 0.5 XC 0.75 TC ANSWER DOWNLOAD EXAMIANS APP