Process Equipment and Plant Design The thickness of segmental baffles (25 -35% cut truncated plates usually) is generally __________ the tube wall thickness. Four times Equal to Half Twice Four times Equal to Half Twice ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design In seive plate column, holes are drilled or punched in sizes ranging from 2.5 to 12 mm (5 mm being widely used). The hole pitch is normally __________ times the hole diameter to give the required hole area. 10 to 15 0.5 to 1.5 2.5 to 4.0 5 to 10 10 to 15 0.5 to 1.5 2.5 to 4.0 5 to 10 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design In a thin cylindrical shell, the hoop stress is __________ stress. Radial Circumferential tensile Longitudinal Compressive Radial Circumferential tensile Longitudinal Compressive ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design In a shell and tube heat exchanger, the 'tube pitch' is defined as the Shortest centre to centre distance between adjacent tubes None of these O.D. of the tube for square pitch Shortest distance between two adj acent tube holes Shortest centre to centre distance between adjacent tubes None of these O.D. of the tube for square pitch Shortest distance between two adj acent tube holes ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design A certain pressure vessel manufacturer avoids doing reinforcements calculations for openings by always providing a reinforcing pad extending upto double the diameter of the opening and of the same material and thickness as that of the shell wall. If area compensation is accepted as a code guideline, his approach leads to safe design Only if the opening is on spherical vessel Only if the opening is on a vertical cylinderical vessel Irrespective of the shape of the vessel Only if the opening is on a horizontal cylinderical vessel Only if the opening is on spherical vessel Only if the opening is on a vertical cylinderical vessel Irrespective of the shape of the vessel Only if the opening is on a horizontal cylinderical vessel ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design A forced circulation long tube vertical evaporator as compared to the natural circulation evaporator Employs high velocity, high heat transfer rate and less heating surface requirement Employs a centrifugal pump placed between external downtake from vapor drum and inlet to tube bundle Both B & C Is economical in operation Employs high velocity, high heat transfer rate and less heating surface requirement Employs a centrifugal pump placed between external downtake from vapor drum and inlet to tube bundle Both B & C Is economical in operation ANSWER DOWNLOAD EXAMIANS APP