Building Construction The stone masonry of finely dressed stones laid in cement or lime, is Coursed rubble masonry Random rubble masonry Ashlar masonry Dry rubble masonry Coursed rubble masonry Random rubble masonry Ashlar masonry Dry rubble masonry ANSWER DOWNLOAD EXAMIANS APP
Building Construction Which one of the following factors is considered for the orientation of buildings? All listed here The extent up to which the sunrays penetrate with the verandah The exposure of the walls and roof of the buildings to the rays of sun The direction of the prevailing winds in the area All listed here The extent up to which the sunrays penetrate with the verandah The exposure of the walls and roof of the buildings to the rays of sun The direction of the prevailing winds in the area ANSWER DOWNLOAD EXAMIANS APP
Building Construction According to Rankine's formula, minimum depth of foundations, is (P/w) × [(1 + sin φ)/(1 - sin φ)] (P/w) × [(1 + sin φ)/(1 - sin φ)]² (P/2w) × [(1 - sin φ)/(1 + sin φ)]² (P/w) × [(1 - sin φ)/(1 + sin φ)]² (P/w) × [(1 + sin φ)/(1 - sin φ)] (P/w) × [(1 + sin φ)/(1 - sin φ)]² (P/2w) × [(1 - sin φ)/(1 + sin φ)]² (P/w) × [(1 - sin φ)/(1 + sin φ)]² ANSWER DOWNLOAD EXAMIANS APP
Building Construction Under reamed piles are generally used for All listed here Tall structures Machine foundations Factory building All listed here Tall structures Machine foundations Factory building ANSWER DOWNLOAD EXAMIANS APP
Building Construction The steel pile which is generally sunk in soft clay or loose sand of low bearing capacity, is Pipe pile Disc pile Screw pile H-pile Pipe pile Disc pile Screw pile H-pile ANSWER DOWNLOAD EXAMIANS APP
Building Construction Which one of the following activities is not correct as applicable to brick corbels Stretcher bond is generally used for the construction of brick corbel The discontinuous corbels are used to carry heavy concentrated loads The maximum projection of the corbel should not be more than the thickness of the wall The maximum projection of each corbel course should be limited to a quarter brick at a time Stretcher bond is generally used for the construction of brick corbel The discontinuous corbels are used to carry heavy concentrated loads The maximum projection of the corbel should not be more than the thickness of the wall The maximum projection of each corbel course should be limited to a quarter brick at a time ANSWER DOWNLOAD EXAMIANS APP