Building Construction The horizontal timber piece provided at the apex of a roof truss which supports the common rafter is called Valley rafter Eaves board Ridge board Hip rafter Valley rafter Eaves board Ridge board Hip rafter ANSWER DOWNLOAD EXAMIANS APP
Building Construction While investigating the site, a thick layer of fairly firm clay over a deep layer of soft clay is encountered. In such a situation, the following type of foundation is useful: Raft foundation None of these Grillage foundation Pile formation Raft foundation None of these Grillage foundation Pile formation ANSWER DOWNLOAD EXAMIANS APP
Building Construction The skirting/dado in a bath roof should be upto Level of the tap 200 cm 15 cm above floor level Ceiling Level of the tap 200 cm 15 cm above floor level Ceiling ANSWER DOWNLOAD EXAMIANS APP
Building Construction The vertical distance between the springing line and highest point of the inner curve of an arch is known as Rise Intrados Spandril Extrados Rise Intrados Spandril Extrados ANSWER DOWNLOAD EXAMIANS APP
Building Construction The form work from the underside of slabs, can be removed only after 4 days 1 day 14 days 7 days 4 days 1 day 14 days 7 days ANSWER DOWNLOAD EXAMIANS APP
Building Construction In the method of tube boring of soil investigation, the following is essential: A flap valve at the bottom of tube is provided to extract the soil sample All listed here The tube is raised and lowered by 4 thick rope moving over a pulley suspended on a tripod stand A tube of about 2 meters length and 20 cm diameter with a cutting edge A flap valve at the bottom of tube is provided to extract the soil sample All listed here The tube is raised and lowered by 4 thick rope moving over a pulley suspended on a tripod stand A tube of about 2 meters length and 20 cm diameter with a cutting edge ANSWER DOWNLOAD EXAMIANS APP