The ratio of reset to pick up current for an induction cup relay is approximately

 0.75.
  0.99.
 1.0.
 1.35.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Ideal plant load cfactor is

 less than 1
 1
 0
 greater than 1

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
Ferranti effect will not occur in which of the following transmission lines

All of these
 long transmission lines
 short transmission lines
 medium transmission lines

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
At slack bus, which one of the following combinations of variables is not specified?

 Q and V
 V and δ
 P and Q
 P and V

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
In what from the initial energy will be released for the 200 MeV per fission by a neutron in a slow thermal nuclear reactor

  kinetic energy of particles and electromagnetic radiation.
 kinetic energy and sound energy.
 electromagnetic radiations.
 heat energy.

ANSWER DOWNLOAD EXAMIANS APP

Power Systems
The corona loss on a particular system at 50 Hz is 1 kW/km per phase. What is the corona loss at 60 Hz in kW/km per phase?

 1.25
 0.89
 1.13
 1

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Power Systems

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑