Industrial Engineering and Production Management The objective of time study is to determine the time required to complete a job by Average worker Fast worker Slow worker New entrant Average worker Fast worker Slow worker New entrant ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management A PERT network has three activities on critical path with mean time 3, 8 and 6 and standard deviations 1, 2 and 2 respectively. The probability that the project will be completed in 20 days is 0.84 0.66 0.5 0.95 0.84 0.66 0.5 0.95 ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management In a PERT chart All activities should be numbered Only selected activities are numbered Only critical activities are numbered Only important activities should be numbered All activities should be numbered Only selected activities are numbered Only critical activities are numbered Only important activities should be numbered ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The factors which are to be considered while developing a good wage incentive plan will include Adequate incentive Guaranteed basic pay Ease of administration All of the listed here Adequate incentive Guaranteed basic pay Ease of administration All of the listed here ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The procedure of modifying work content to give more meaning and enjoyment to the job by involving employees in planning, organisation and control of their work, is termed as Job enlargement Job evaluation Job rotation Job enrichment Job enlargement Job evaluation Job rotation Job enrichment ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The main disadvantage of line organisation is Structure is rigid Top level executives have to do excessive work All of these Communication delays occur Structure is rigid Top level executives have to do excessive work All of these Communication delays occur ANSWER DOWNLOAD EXAMIANS APP