Industrial Engineering and Production Management CPM is the Event oriented technique Activity oriented technique Time oriented technique Target oriented technique Event oriented technique Activity oriented technique Time oriented technique Target oriented technique ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The determination of standard time in a complex job system is best done through Stop watch time study Analysis of micro-motions Analysis of standard data system Grouping timing technique Stop watch time study Analysis of micro-motions Analysis of standard data system Grouping timing technique ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Abbreviated work factor data is applied for Maintenance operation All of these Material handling operation Packing and shipping operation Maintenance operation All of these Material handling operation Packing and shipping operation ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management If (R) is the base rate guaranteed per hour, (S) is the standard time for the job and (T) is the actual time, then according to Rowan plan, wages for the job will be TR + [(S - T)/2] × R TR + [(S - T)/S] × R TR TR + (S - T) × R TR + [(S - T)/2] × R TR + [(S - T)/S] × R TR TR + (S - T) × R ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Father of time study was H.L. Gantt R.M. Barnes F.W. Taylor F.B. Gilbert H.L. Gantt R.M. Barnes F.W. Taylor F.B. Gilbert ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management A PERT network has three activities on critical path with mean time 3, 8 and 6 and standard deviations 1, 2 and 2 respectively. The probability that the project will be completed in 20 days is 0.5 0.84 0.95 0.66 0.5 0.84 0.95 0.66 ANSWER DOWNLOAD EXAMIANS APP