Industrial Engineering and Production Management The main advantage of line organisation is its All of these Defined responsibilities at all levels Effective command and control Rigid discipline in the organisation All of these Defined responsibilities at all levels Effective command and control Rigid discipline in the organisation ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Which of the following statement is correct about the network diagram? The head of the arrow represents the end of an activity. The tail end of the arrow represents the start of an activity. All of the these The events are represented graphically by circles or nodes at the beginning and the end of activity by arrows. The head of the arrow represents the end of an activity. The tail end of the arrow represents the start of an activity. All of the these The events are represented graphically by circles or nodes at the beginning and the end of activity by arrows. ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Which of the following are the guidelines for the construction of a network diagram? Dummy activity consumes no time or resource Each activity is represented by one and only one arrow in the network Dangling must be avoided in a network diagram All of the these Dummy activity consumes no time or resource Each activity is represented by one and only one arrow in the network Dangling must be avoided in a network diagram All of the these ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management PERT stands for Process Estimation and Review Technique Planning Estimation and Resulting Technique Program Evaluation and Review Technique Program Estimation and Reporting Technique Process Estimation and Review Technique Planning Estimation and Resulting Technique Program Evaluation and Review Technique Program Estimation and Reporting Technique ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management If a worker gets a daily wage of Rs HA, then according to Rowan plan, his maximum daily earnings can be 1.15 HA 2 HA 1.5 HA 1.33 HA 1.15 HA 2 HA 1.5 HA 1.33 HA ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management In queuing theory, the nature of the waiting situation can be studied and analysed mathematically if All variables and constants are known and form a linear equation Arrival and waiting times are known and can be grouped to form a waiting line model Complete details of items in, waiting line are known The laws governing arrivals, service times, and the order in which the arriving units are taken into source are known All variables and constants are known and form a linear equation Arrival and waiting times are known and can be grouped to form a waiting line model Complete details of items in, waiting line are known The laws governing arrivals, service times, and the order in which the arriving units are taken into source are known ANSWER DOWNLOAD EXAMIANS APP