Industrial Engineering and Production Management Gantt chart is used for Material handling Production schedule Machine repair schedules Inventory control Material handling Production schedule Machine repair schedules Inventory control ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management When slack of an activity is negative The activity is critical and any delay in its performance will delay the completion of whole project It represents a situation where extra resources are available and the completion of project is not delayed All of these It represents that a programme falls behind schedule and additional resources are required to complete the project in time The activity is critical and any delay in its performance will delay the completion of whole project It represents a situation where extra resources are available and the completion of project is not delayed All of these It represents that a programme falls behind schedule and additional resources are required to complete the project in time ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Abbreviated work factor data is applied for Packing and shipping operation Maintenance operation Material handling operation All of these Packing and shipping operation Maintenance operation Material handling operation All of these ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Which of the following are the guidelines for the construction of a network diagram? All of the these Each activity is represented by one and only one arrow in the network Dangling must be avoided in a network diagram Dummy activity consumes no time or resource All of the these Each activity is represented by one and only one arrow in the network Dangling must be avoided in a network diagram Dummy activity consumes no time or resource ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management CPM requires Single time estimate None of these Triple time estimate Double time estimate Single time estimate None of these Triple time estimate Double time estimate ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Critical path on PERT/CPM chart is obtained by joining the events having No slack Maximum slack Average slack Minimum slack No slack Maximum slack Average slack Minimum slack ANSWER DOWNLOAD EXAMIANS APP