Industrial Engineering and Production Management The purpose of micro-motion study is to Assist in finding out the most efficient way of doing work All of these Train the individual operator regarding the motion economy principles Help in collecting the motion time data for synthetic time standards Assist in finding out the most efficient way of doing work All of these Train the individual operator regarding the motion economy principles Help in collecting the motion time data for synthetic time standards ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The difference between the time available to do the job and the time required to do the job, is known as Constraint Duration Float Event Constraint Duration Float Event ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The main advantage of line organisation is its Rigid discipline in the organisation Defined responsibilities at all levels All of these Effective command and control Rigid discipline in the organisation Defined responsibilities at all levels All of these Effective command and control ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management PERT analysis is based upon Optimistic time Pessimistic time Most likely time All of these Optimistic time Pessimistic time Most likely time All of these ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management If (R) is the base rate guaranteed per hour, (S) is the standard time for the job and (T) is the actual time, then according to Halsey 50-50 plan, wages for the job will be TR + (S - T) × R TR TR + [(S - T)/S] × R TR + [(S - T)/2] × R TR + (S - T) × R TR TR + [(S - T)/S] × R TR + [(S - T)/2] × R ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Basic motion time study gives times for basic motions in ten thousandths of Minute Second Day Hour Minute Second Day Hour ANSWER DOWNLOAD EXAMIANS APP