Industrial Engineering and Production Management Acceptance sampling is used in Mass production Job production All of these Batch production Mass production Job production All of these Batch production ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Process layout is employed Where similar jobs are manufactured on similar machines All of these Where low volume of production is required Where machines are arranged on functional basis Where similar jobs are manufactured on similar machines All of these Where low volume of production is required Where machines are arranged on functional basis ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management A-B-C analysis is used in Inventory control CPM All of these PERT Inventory control CPM All of these PERT ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Work study comprises following main techniques Method study and job evaluation Time study and work measurement Method study and time study Method study and work measurement Method study and job evaluation Time study and work measurement Method study and time study Method study and work measurement ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The start or completion of task is called An activity A duration An event None of these An activity A duration An event None of these ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Critical path moves along the activities having total float of Negative value Zero value Same value Positive value Negative value Zero value Same value Positive value ANSWER DOWNLOAD EXAMIANS APP