Industrial Engineering and Production Management 'O' on a PERT/CPM chart represents Dangling event A significant event representing some milestone An ordinary event An event to be transferred to other network chart Dangling event A significant event representing some milestone An ordinary event An event to be transferred to other network chart ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management 'Value' for value engineering and analysis purposes is defined as Depreciated value Saleable value Function/cost Purchase value Depreciated value Saleable value Function/cost Purchase value ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management In jobbing production All of these Unit costs are high Highly skilled workers are needed Operations are labour-intensive All of these Unit costs are high Highly skilled workers are needed Operations are labour-intensive ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The unit cost in case of batch production is __________as compared to jobbing production. Same None of these High Low Same None of these High Low ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Positive slack on a PERT indicates that project is On critical path As per schedule Beyond schedule Ahead of schedule On critical path As per schedule Beyond schedule Ahead of schedule ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management PMTP (predetermined motion time systems) include MTM (method time measurement) BNTS (basic motion time study) WFS (work factor systems) All of these MTM (method time measurement) BNTS (basic motion time study) WFS (work factor systems) All of these ANSWER DOWNLOAD EXAMIANS APP