Industrial Engineering and Production Management Which one of the following chart gives simultaneously information about the progress of work and machine loading? Man-machine chart Gantt chart Process chart Machine load chart Man-machine chart Gantt chart Process chart Machine load chart ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Bar charts are suitable for Minor works All of these Major works Large projects Minor works All of these Major works Large projects ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The probabilistic time is given by (where to = Optimistic time, tp = Pessimistic time, and tn = Most likely time) (to + tp + 4tn)/6 (to + 2tp + tn)/4 (to + tp + tn)/3 (to + 4tp + tn)/5 (to + tp + 4tn)/6 (to + 2tp + tn)/4 (to + tp + tn)/3 (to + 4tp + tn)/5 ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Gantt chart is used for Material handling Machine repair schedules Inventory control Production schedule Material handling Machine repair schedules Inventory control Production schedule ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The time taken by a trained worker to perform an operation, while working a steady pace, is known as Standard time Normal time None of the listed here Representative time Standard time Normal time None of the listed here Representative time ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management In time study, the rating factor is applied to determine Standard time of a job Merit rating of the worker Fixation of incentive rate Normal time of a worker Standard time of a job Merit rating of the worker Fixation of incentive rate Normal time of a worker ANSWER DOWNLOAD EXAMIANS APP