Industrial Engineering and Production Management Work study involves Only motion study Only method study Only work measurement Method study and work measurement Only motion study Only method study Only work measurement Method study and work measurement ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The assumption in PERT is A project will always be behind schedule, if left uncorrected Cost of project will always be more than the estimated cost, if no timely corrections are taken Activities are fixed and can't be changed A project can be subdivided into a set of predictable, independent activities A project will always be behind schedule, if left uncorrected Cost of project will always be more than the estimated cost, if no timely corrections are taken Activities are fixed and can't be changed A project can be subdivided into a set of predictable, independent activities ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management PERT analysis is based upon Pessimistic time Optimistic time All of these Most likely time Pessimistic time Optimistic time All of these Most likely time ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management In steel plant the most important system for materials handling is Cranes and hoists Trucks Locos Conveyors Cranes and hoists Trucks Locos Conveyors ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Critical path on PERT/CPM chart is obtained by joining the events having Maximum slack Average slack No slack Minimum slack Maximum slack Average slack No slack Minimum slack ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Work study is done with the help of Material handling Process chart All of the these Stop watch Material handling Process chart All of the these Stop watch ANSWER DOWNLOAD EXAMIANS APP