Industrial Engineering and Production Management A systematic job improvement sequence will consist of Motion study Time study All of these Job enrichment Motion study Time study All of these Job enrichment ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The unit cost in case of batch production is __________as compared to jobbing production. Low Same High None of these Low Same High None of these ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The process capability of a machine is defined as the capability of the machine to Produce job at a definite spectrum of speed Produces a definite volume of work per minute Holds a definite spectrum of tolerance and surface finish Perform definite number of operations Produce job at a definite spectrum of speed Produces a definite volume of work per minute Holds a definite spectrum of tolerance and surface finish Perform definite number of operations ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management A dummy activity in a net work diagram Is represented by a dotted line Is an artificial activity Does not consume time or resources All of these Is represented by a dotted line Is an artificial activity Does not consume time or resources All of these ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management For handling materials during manufacture of cement, a _________ is widely used. Bucket conveyor Belt conveyor Fork lift truck Overhead crane Bucket conveyor Belt conveyor Fork lift truck Overhead crane ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management CPM stands for Critical Process Method Critical Path Method Common Planning Method Combined Process Method Critical Process Method Critical Path Method Common Planning Method Combined Process Method ANSWER DOWNLOAD EXAMIANS APP