Industrial Engineering and Production Management Process layout is employed for Continuous type of product All of these Effective utilization of machines Batch production Continuous type of product All of these Effective utilization of machines Batch production ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management PERT requires Double time estimate Single time estimate None of the listed here Triple time estimate Double time estimate Single time estimate None of the listed here Triple time estimate ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management In the cost structure of a product, the selling price is determined by the factors such as Various elements of the cost Lowest competitive price Sales turn over All of these Various elements of the cost Lowest competitive price Sales turn over All of these ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Which of the following conditions are necessary for applying linear programming? These must be a well defined objective function. All of these The decision variables should be interrelated and nonnegative. The resources must be in limited supply. These must be a well defined objective function. All of these The decision variables should be interrelated and nonnegative. The resources must be in limited supply. ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management In the Emerson efficiency plan, a worker receives only his daily wage and no bonus is paid till his efficiency reaches 0.5 0.6667 0.8 0.75 0.5 0.6667 0.8 0.75 ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management PERT analysis is based upon Most likely time Pessimistic time All of these Optimistic time Most likely time Pessimistic time All of these Optimistic time ANSWER DOWNLOAD EXAMIANS APP