Industrial Engineering and Production Management Gantt chart provides information about the Material handling Production schedule Proper utilization of manpower Efficient working of machine Material handling Production schedule Proper utilization of manpower Efficient working of machine ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management PMTP (predetermined motion time systems) include MTM (method time measurement) WFS (work factor systems) All of these BNTS (basic motion time study) MTM (method time measurement) WFS (work factor systems) All of these BNTS (basic motion time study) ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The term 'value' in value engineering refers to Utility of the product Manufactured cost of the product Total cost of the product Selling price of the product Utility of the product Manufactured cost of the product Total cost of the product Selling price of the product ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Time study is carried out By finding all the significant informations regarding the job, work place and machine tool etc By observing and recording the time taken by the operator for an operation All of these By breaking up each operation into small elements which are measurable with the help of the measuring device accurately By finding all the significant informations regarding the job, work place and machine tool etc By observing and recording the time taken by the operator for an operation All of these By breaking up each operation into small elements which are measurable with the help of the measuring device accurately ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The important file in making a PERT is No activity from any event can be started from preceding event till it is completed An event can't be accomplished until activities leading to it are completed All of the these Length of arrow has nothing to do with time No activity from any event can be started from preceding event till it is completed An event can't be accomplished until activities leading to it are completed All of the these Length of arrow has nothing to do with time ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Which of the following incentive plans ensures a part of the swing to the worker and rest to the employer? Gilbert plan Emerson efficiency plan Taylor plan Halsey premium plan Gilbert plan Emerson efficiency plan Taylor plan Halsey premium plan ANSWER DOWNLOAD EXAMIANS APP