Industrial Engineering and Production Management For handling materials during manufacture of cement, a _________ is widely used. Bucket conveyor Fork lift truck Belt conveyor Overhead crane Bucket conveyor Fork lift truck Belt conveyor Overhead crane ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Product layout is best suited where All of these Product is manufactured in large quantities Product is standardized One type of product is produced All of these Product is manufactured in large quantities Product is standardized One type of product is produced ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Queuing theory is associated with Inspection time Waiting time Production time Sales Inspection time Waiting time Production time Sales ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Scheduling gives information about That how idle time can be minimized When work should start and how much work should be completed during a certain period When work should complete Proper utilization of machines That how idle time can be minimized When work should start and how much work should be completed during a certain period When work should complete Proper utilization of machines ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Graphical method, simplex method, and transportation method are concerned with Value analysis Break-even analysis Queueing theory Linear programming Value analysis Break-even analysis Queueing theory Linear programming ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management When slack of an activity is negative All of these The activity is critical and any delay in its performance will delay the completion of whole project It represents that a programme falls behind schedule and additional resources are required to complete the project in time It represents a situation where extra resources are available and the completion of project is not delayed All of these The activity is critical and any delay in its performance will delay the completion of whole project It represents that a programme falls behind schedule and additional resources are required to complete the project in time It represents a situation where extra resources are available and the completion of project is not delayed ANSWER DOWNLOAD EXAMIANS APP