Industrial Engineering and Production Management The important file in making a PERT is All of the these Length of arrow has nothing to do with time No activity from any event can be started from preceding event till it is completed An event can't be accomplished until activities leading to it are completed All of the these Length of arrow has nothing to do with time No activity from any event can be started from preceding event till it is completed An event can't be accomplished until activities leading to it are completed ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management An optimum project schedule implies Optimum utilization of men, machines and materials To produce best results under given constraints Lowest possible cost and shortest possible time for project Timely execution of project Optimum utilization of men, machines and materials To produce best results under given constraints Lowest possible cost and shortest possible time for project Timely execution of project ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Which of the following incentive plans ensures a part of the swing to the worker and rest to the employer? Gilbert plan Halsey premium plan Emerson efficiency plan Taylor plan Gilbert plan Halsey premium plan Emerson efficiency plan Taylor plan ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Percent idle time for men or machines is found by Work study Time study Work sampling Method study Work study Time study Work sampling Method study ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management One of the basic essentials of an incentive plan is that Provide incentive to group efficiency performance All standards should be based on time studies A differential piece rate system should exist Minimum wages should be guaranteed Provide incentive to group efficiency performance All standards should be based on time studies A differential piece rate system should exist Minimum wages should be guaranteed ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Pick up the correct step used for scheduling a project by C.P.M. Sequence of various activities is made according to their importance A project is divided into various activities All of these Required time for each activity is established Sequence of various activities is made according to their importance A project is divided into various activities All of these Required time for each activity is established ANSWER DOWNLOAD EXAMIANS APP