Industrial Engineering and Production Management In the perpetual inventory control, the material is checked when it reaches its Alarming value Minimum value Maximum value Average value Alarming value Minimum value Maximum value Average value ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The most popular type of organisation used for Civil Engineering Constructions is Effective organization Functional organization Line and staff organization Line organization Effective organization Functional organization Line and staff organization Line organization ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The average time recorded by work study man for an operation is called Standard time Normal time None of these Representative time Standard time Normal time None of these Representative time ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Positive slack on a PERT indicates that project is Beyond schedule As per schedule On critical path Ahead of schedule Beyond schedule As per schedule On critical path Ahead of schedule ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The basic difference between PERT and CPM is that Guessed times are used in PERT and evaluated times in CPM Costs are considered on CPM only and not in PERT Critical path is determined in PERT only PERT deals with events and CPM with activities Guessed times are used in PERT and evaluated times in CPM Costs are considered on CPM only and not in PERT Critical path is determined in PERT only PERT deals with events and CPM with activities ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The technique of value analysis can be applied to Any item Crash programmer items only Complicated items only Simple items only Any item Crash programmer items only Complicated items only Simple items only ANSWER DOWNLOAD EXAMIANS APP