Industrial Engineering and Production Management The salient feature of functional organisation is Separation of planning and design part All of these Each individual maintains functional efficiency Strict adherence to specification Separation of planning and design part All of these Each individual maintains functional efficiency Strict adherence to specification ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Critical path moves along the activities having total float of Zero value Negative value Positive value Same value Zero value Negative value Positive value Same value ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management In the Emerson efficiency plan, a worker receives only his daily wage and no bonus is paid till his efficiency reaches 0.75 0.5 0.6667 0.8 0.75 0.5 0.6667 0.8 ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management In Halsey 50-50 plan, output standards are established From one's judgment By time study From previous production records All of these From one's judgment By time study From previous production records All of these ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management A device used for lifting or lowering objects suspended from a hook at the end of retractable chains or cable is called Chain conveyor Hoist Portable elevator Jib crane Chain conveyor Hoist Portable elevator Jib crane ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The reasons which are basically responsible for the formation of a queue should be that Output rate is linearly proportional to input The average service rate Hess than the average arrival rate Output rate is constant and the input varies in a random manner All of these Output rate is linearly proportional to input The average service rate Hess than the average arrival rate Output rate is constant and the input varies in a random manner All of these ANSWER DOWNLOAD EXAMIANS APP