Industrial Engineering and Production Management The salient feature of functional organisation is Each individual maintains functional efficiency All of these Strict adherence to specification Separation of planning and design part Each individual maintains functional efficiency All of these Strict adherence to specification Separation of planning and design part ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Standard time is equal to (Normal time) + (allowances) (Normal time) - (allowances) Normal time taken by an operation Representative time multiplied by rating factor (Normal time) + (allowances) (Normal time) - (allowances) Normal time taken by an operation Representative time multiplied by rating factor ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management In product layout Specialized and strict supervision is required Manufacturing cost rises with a fall in the volume of production All of these Machines can not be used to their maximum capacity Specialized and strict supervision is required Manufacturing cost rises with a fall in the volume of production All of these Machines can not be used to their maximum capacity ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management If TL is the largest allowable event occurrence time, total activity slack (s) is equal to TLEFT All of these Latest finish time earliest finish time (EFT) Latest start time earliest start time TLEFT All of these Latest finish time earliest finish time (EFT) Latest start time earliest start time ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The determination of standard time in a complex job system is best done through Analysis of standard data system Analysis of micro-motions Grouping timing technique Stop watch time study Analysis of standard data system Analysis of micro-motions Grouping timing technique Stop watch time study ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management String diagram is used when All of these Material handling is to be done Team of workers is working at a place Idle time is to be reduced All of these Material handling is to be done Team of workers is working at a place Idle time is to be reduced ANSWER DOWNLOAD EXAMIANS APP