Industrial Engineering and Production Management The main disadvantage of line organisation is Communication delays occur All of these Top level executives have to do excessive work Structure is rigid Communication delays occur All of these Top level executives have to do excessive work Structure is rigid ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management PMTP (predetermined motion time systems) include MTM (method time measurement) BNTS (basic motion time study) All of these WFS (work factor systems) MTM (method time measurement) BNTS (basic motion time study) All of these WFS (work factor systems) ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Which of the following type of layout is suitable for automobile manufacturing concern? Fixed position layout Process layout Product layout Combination layout Fixed position layout Process layout Product layout Combination layout ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management A feasible solution to the linear programming problem should Satisfy the non-negativity restrictions Satisfy the problem constraints and non-negativity restrictions Optimise the objective function Satisfy the problem constraints Satisfy the non-negativity restrictions Satisfy the problem constraints and non-negativity restrictions Optimise the objective function Satisfy the problem constraints ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Queueing theory is used for Job-shop scheduling All of these Traffic congestion studies Inventory problems Job-shop scheduling All of these Traffic congestion studies Inventory problems ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management When slack of an activity is positive It represents that a programme falls behind schedule and additional resources are required to complete the project in time It represents a situation where extra resources are available and the completion of project is not delayed The activity is critical and any delay in its performance will delay the completion of whole project Any one of the above It represents that a programme falls behind schedule and additional resources are required to complete the project in time It represents a situation where extra resources are available and the completion of project is not delayed The activity is critical and any delay in its performance will delay the completion of whole project Any one of the above ANSWER DOWNLOAD EXAMIANS APP