Industrial Engineering and Production Management
The assumption in PERT is

Cost of project will always be more than the estimated cost, if no timely corrections are taken
A project will always be behind schedule, if left uncorrected
Activities are fixed and can't be changed
A project can be subdivided into a set of predictable, independent activities

ANSWER DOWNLOAD EXAMIANS APP

Industrial Engineering and Production Management
Time study is carried out

By observing and recording the time taken by the operator for an operation
By finding all the significant informations regarding the job, work place and machine tool etc
All of these
By breaking up each operation into small elements which are measurable with the help of the measuring device accurately

ANSWER DOWNLOAD EXAMIANS APP