Industrial Engineering and Production Management A-B-C analysis Is a basic technique of materials management Does not depend upon the unit cost of the item but on its annual consumption All of the these Is meant for relative inventory control Is a basic technique of materials management Does not depend upon the unit cost of the item but on its annual consumption All of the these Is meant for relative inventory control ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Micro motion study is Study of man and machine conducted simultaneously Motion study observed on enhanced time intervals Motion study of a sequence of operations conducted systematically Analysis of a man-work method by using a motion picture camera with a timing device in the field of view Study of man and machine conducted simultaneously Motion study observed on enhanced time intervals Motion study of a sequence of operations conducted systematically Analysis of a man-work method by using a motion picture camera with a timing device in the field of view ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Which one of the following represents a group incentive plan? Taylor Differential Piece Rate System Scanlon Plan Halsey Premium Plan Rowan Plan Taylor Differential Piece Rate System Scanlon Plan Halsey Premium Plan Rowan Plan ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management In the Halsey system of wage incentive plan, a worker is Paid as per efficiency Ensured of minimum wages Not paid any bonus till his efficiency Never a loser Paid as per efficiency Ensured of minimum wages Not paid any bonus till his efficiency Never a loser ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management In product layout Manufacturing cost rises with a fall in the volume of production All of these Specialized and strict supervision is required Machines can not be used to their maximum capacity Manufacturing cost rises with a fall in the volume of production All of these Specialized and strict supervision is required Machines can not be used to their maximum capacity ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Pessimistic time is The minimum time in which an activity can possibly be accomplished The average time required for a job The maximum time which an activity might require The most probable time considering all conditions The minimum time in which an activity can possibly be accomplished The average time required for a job The maximum time which an activity might require The most probable time considering all conditions ANSWER DOWNLOAD EXAMIANS APP