Industrial Engineering and Production Management Choose the wrong statement. Motion study is used for Improvising a work method Improving a work method Designing a work method Reducing inventory costs Improvising a work method Improving a work method Designing a work method Reducing inventory costs ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management One time measurement unit (TMU) in method time measurement system equals 0.001 minute 0.0006 minute 0.0001 minute 0.006 minute 0.001 minute 0.0006 minute 0.0001 minute 0.006 minute ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Monte Carlo solutions in queuing theory are extremely useful in queuing problems All of the these That can't be analysed mathematically To verify mathematical results Involving multistage queuing All of the these That can't be analysed mathematically To verify mathematical results Involving multistage queuing ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management In the Halsey system of wage incentive plan, a worker is Paid as per efficiency Not paid any bonus till his efficiency Never a loser Ensured of minimum wages Paid as per efficiency Not paid any bonus till his efficiency Never a loser Ensured of minimum wages ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Military organisation is known as Line organisation All of these Functional organisation Line and staff organisation Line organisation All of these Functional organisation Line and staff organisation ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Time study is carried out All of these By finding all the significant informations regarding the job, work place and machine tool etc By observing and recording the time taken by the operator for an operation By breaking up each operation into small elements which are measurable with the help of the measuring device accurately All of these By finding all the significant informations regarding the job, work place and machine tool etc By observing and recording the time taken by the operator for an operation By breaking up each operation into small elements which are measurable with the help of the measuring device accurately ANSWER DOWNLOAD EXAMIANS APP