Industrial Engineering and Production Management What does symbol 'V' employ in work study Permanent storage Inspection Operation Delay/ temporary Storage Permanent storage Inspection Operation Delay/ temporary Storage ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management CPM has following time estimate Two time estimate One time estimate Four time estimate Three time estimate Two time estimate One time estimate Four time estimate Three time estimate ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The start or completion of task is called An event A duration None of these An activity An event A duration None of these An activity ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The main object of scientific layout is All of these To utilize maximum floor area To minimize production delays To produce better quality of product All of these To utilize maximum floor area To minimize production delays To produce better quality of product ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Critical path on PERT/CPM chart is obtained by joining the events having Average slack Minimum slack Maximum slack No slack Average slack Minimum slack Maximum slack No slack ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management String diagram is used When a group of workers are working at a place For checking the relative values of various layouts All of these Where processes require the operator to be moved from one place to another When a group of workers are working at a place For checking the relative values of various layouts All of these Where processes require the operator to be moved from one place to another ANSWER DOWNLOAD EXAMIANS APP