Industrial Engineering and Production Management According to MAPI formula, the old machine should be replaced by new one when(Here, CAM = Challenger's Adverse minimum, DAM = Defender's Adverse minimum) CAM > DAM There is no such criterion CAM = DAM CAM < DAM CAM > DAM There is no such criterion CAM = DAM CAM < DAM ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management M.T.M. is used to Improve existing methods Establish time standards Develop effective methods in advance of the beginning of production All of these Improve existing methods Establish time standards Develop effective methods in advance of the beginning of production All of these ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Inventory management consists of State of merchandise methods of storing and maintenance etc. Stock control system Effective running of stores All of these State of merchandise methods of storing and maintenance etc. Stock control system Effective running of stores All of these ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Indirect expenses include Administrative expenses Factory expenses All of these Selling expenses Administrative expenses Factory expenses All of these Selling expenses ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The factors which are to be considered while developing a good wage incentive plan will include Guaranteed basic pay Adequate incentive Ease of administration All of the listed here Guaranteed basic pay Adequate incentive Ease of administration All of the listed here ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management If TL is the largest allowable event occurrence time, total activity slack (s) is equal to All of these Latest start time earliest start time Latest finish time earliest finish time (EFT) TLEFT All of these Latest start time earliest start time Latest finish time earliest finish time (EFT) TLEFT ANSWER DOWNLOAD EXAMIANS APP