Industrial Engineering and Production Management Work study is concerned with Improving production capability Improving present method and finding standard time Motivation of workers Improving production planning and control Improving production capability Improving present method and finding standard time Motivation of workers Improving production planning and control ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The main object of scientific layout is To produce better quality of product To utilize maximum floor area All of these To minimize production delays To produce better quality of product To utilize maximum floor area All of these To minimize production delays ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The main disadvantage of line organisation is Top level executives have to do excessive work All of these Communication delays occur Structure is rigid Top level executives have to do excessive work All of these Communication delays occur Structure is rigid ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The purpose of micro-motion study is to Train the individual operator regarding the motion economy principles Assist in finding out the most efficient way of doing work Help in collecting the motion time data for synthetic time standards All of these Train the individual operator regarding the motion economy principles Assist in finding out the most efficient way of doing work Help in collecting the motion time data for synthetic time standards All of these ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The assumption in PERT is Activities are fixed and can't be changed A project can be subdivided into a set of predictable, independent activities A project will always be behind schedule, if left uncorrected Cost of project will always be more than the estimated cost, if no timely corrections are taken Activities are fixed and can't be changed A project can be subdivided into a set of predictable, independent activities A project will always be behind schedule, if left uncorrected Cost of project will always be more than the estimated cost, if no timely corrections are taken ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Which of the following organizations is best suited for steel plants Staff organization Line organization Line, staff and functional organizations Functional organization Staff organization Line organization Line, staff and functional organizations Functional organization ANSWER DOWNLOAD EXAMIANS APP