Industrial Engineering and Production Management Critical path on PERT/CPM chart is obtained by joining the events having No slack Minimum slack Maximum slack Average slack No slack Minimum slack Maximum slack Average slack ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Graphical method, simplex method, and transportation method are concerned with Linear programming Break-even analysis Value analysis Queueing theory Linear programming Break-even analysis Value analysis Queueing theory ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management PMTP (predetermined motion time systems) include All of these BNTS (basic motion time study) MTM (method time measurement) WFS (work factor systems) All of these BNTS (basic motion time study) MTM (method time measurement) WFS (work factor systems) ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management If ‘F’ is the fixed cost, ‘V’ is the variable cost per unit (or total variable costs) and ‘P’ is the selling price of each unit (or total sales value), then break-even point is equal to (F × V)/P F/[1 + (V/P)] (F × P)/V F/[1 - (V/P)] (F × V)/P F/[1 + (V/P)] (F × P)/V F/[1 - (V/P)] ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Material handling in automobile industry is done by All of these Trolley Overhead crane Belt conveyor All of these Trolley Overhead crane Belt conveyor ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management What does symbol 'O' imply in work study? Inspection Transport Delay/temporary storage Operation Inspection Transport Delay/temporary storage Operation ANSWER DOWNLOAD EXAMIANS APP