Industrial Engineering and Production Management Critical path on PERT/CPM chart is obtained by joining the events having No slack Average slack Maximum slack Minimum slack No slack Average slack Maximum slack Minimum slack ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management If a worker gets a daily wage of Rs HA, then according to Rowan plan, his maximum daily earnings can be 2 HA 1.33 HA 1.5 HA 1.15 HA 2 HA 1.33 HA 1.5 HA 1.15 HA ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management In Halsey 50-50 plan, output standards are established All of these From previous production records By time study From one's judgment All of these From previous production records By time study From one's judgment ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management What does symbol 'V' employ in work study Inspection Permanent storage Delay/ temporary Storage Operation Inspection Permanent storage Delay/ temporary Storage Operation ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management String diagram is used Where processes require the operator to be moved from one place to another All of these When a group of workers are working at a place For checking the relative values of various layouts Where processes require the operator to be moved from one place to another All of these When a group of workers are working at a place For checking the relative values of various layouts ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management In the Halsey 50-50 plan, the following are rewarded more Past good workers Past poor workers All of the these Past average workers Past good workers Past poor workers All of the these Past average workers ANSWER DOWNLOAD EXAMIANS APP