Industrial Engineering and Production Management Critical path on PERT/CPM chart is obtained by joining the events having No slack Maximum slack Minimum slack Average slack No slack Maximum slack Minimum slack Average slack ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The technique for establishing and maintaining priorities among the various jobs of any project is known as Slotting technique for scheduling Short interval scheduling Event flow scheduling technique Critical ratio scheduling Slotting technique for scheduling Short interval scheduling Event flow scheduling technique Critical ratio scheduling ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management If E is the duration, ES and EF are die earliest start and finish times, LS and LF are latest start and finish times, then the following relation holds good LF = LS + D EF = ES + D LS = LFD All of these LF = LS + D EF = ES + D LS = LFD All of these ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Routing prescribes the Inspection of final product Proper utilization of machines Proper utilization of man power Flow of material in the plant Inspection of final product Proper utilization of machines Proper utilization of man power Flow of material in the plant ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management A systematic job improvement sequence will consist of Time study All of these Motion study Job enrichment Time study All of these Motion study Job enrichment ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management In inventory control, the economic order quantity is the Capability of a plant to produce Optimum lot size Lot corresponding to break-even point Highest level of inventory Capability of a plant to produce Optimum lot size Lot corresponding to break-even point Highest level of inventory ANSWER DOWNLOAD EXAMIANS APP