Industrial Engineering and Production Management Material handling and plant location is analysed by Emerson chart Travel chart Gantt chart Bin chart Emerson chart Travel chart Gantt chart Bin chart ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The time required to complete a task is established and a bonus is paid to the worker for every hour he saves from the established time required. This type of incentive plan is known as Taylor Differential Piece rate system Halsey Premium plan Day work plan Rowan Plan Taylor Differential Piece rate system Halsey Premium plan Day work plan Rowan Plan ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Choose the wrong statement. Motion study is used for Designing a work method Reducing inventory costs Improvising a work method Improving a work method Designing a work method Reducing inventory costs Improvising a work method Improving a work method ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The probabilistic time is given by (where to = Optimistic time, tp = Pessimistic time, and tn = Most likely time) (to + 2tp + tn)/4 (to + tp + 4tn)/6 (to + tp + tn)/3 (to + 4tp + tn)/5 (to + 2tp + tn)/4 (to + tp + 4tn)/6 (to + tp + tn)/3 (to + 4tp + tn)/5 ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management A device used for lifting or lowering objects suspended from a hook at the end of retractable chains or cable is called Portable elevator Hoist Jib crane Chain conveyor Portable elevator Hoist Jib crane Chain conveyor ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Current assets include Inventories Manufacturing plant Common stock held by the firm Manufacturing plant and equipment Inventories Manufacturing plant Common stock held by the firm Manufacturing plant and equipment ANSWER DOWNLOAD EXAMIANS APP