Industrial Engineering and Production Management Material handling and plant location is analysed by Emerson chart Gantt chart Bin chart Travel chart Emerson chart Gantt chart Bin chart Travel chart ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Valve analysis is particularly of interest when Only few components are involved Jobbing work economics are involved Costly equipment is used Production is on large scale Only few components are involved Jobbing work economics are involved Costly equipment is used Production is on large scale ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management An optimum project schedule implies Optimum utilization of men, machines and materials Lowest possible cost and shortest possible time for project Timely execution of project To produce best results under given constraints Optimum utilization of men, machines and materials Lowest possible cost and shortest possible time for project Timely execution of project To produce best results under given constraints ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Choose the wrong statement Time study is used to Determine standard costs Determine overhead expenses Provide a basis for setting piece prices or incentive wages Determine the capability of an operator to handle the number of machines Determine standard costs Determine overhead expenses Provide a basis for setting piece prices or incentive wages Determine the capability of an operator to handle the number of machines ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management If (R) is the base rate guaranteed per hour, (S) is the standard time for the job and (T) is the actual time, then according to Halsey 50-50 plan, wages for the job will be TR + [(S - T)/2] × R TR + (S - T) × R TR TR + [(S - T)/S] × R TR + [(S - T)/2] × R TR + (S - T) × R TR TR + [(S - T)/S] × R ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management In inventory control, the economic order quantity is the Capability of a plant to produce Lot corresponding to break-even point Optimum lot size Highest level of inventory Capability of a plant to produce Lot corresponding to break-even point Optimum lot size Highest level of inventory ANSWER DOWNLOAD EXAMIANS APP