Industrial Engineering and Production Management Material handling and plant location is analysed by Bin chart Travel chart Gantt chart Emerson chart Bin chart Travel chart Gantt chart Emerson chart ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Actual performance of a task is called An event None of these An activity A duration An event None of these An activity A duration ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management PERT is applied for Marketing programmes and advertising programmes Research and development of products All of these Installation of machinery Marketing programmes and advertising programmes Research and development of products All of these Installation of machinery ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Which of the following are the guidelines for the construction of a network diagram? All of the these Dangling must be avoided in a network diagram Each activity is represented by one and only one arrow in the network Dummy activity consumes no time or resource All of the these Dangling must be avoided in a network diagram Each activity is represented by one and only one arrow in the network Dummy activity consumes no time or resource ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management In inventory control, the economic order quantity is the Lot corresponding to break-even point Highest level of inventory Optimum lot size Capability of a plant to produce Lot corresponding to break-even point Highest level of inventory Optimum lot size Capability of a plant to produce ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The most suitable incentive plan for the maintenance section of an industry will be Piece rate system Group incentive plan Simplification Profit sharing plans Piece rate system Group incentive plan Simplification Profit sharing plans ANSWER DOWNLOAD EXAMIANS APP