Industrial Engineering and Production Management Material handling and plant location is analysed by Bin chart Gantt chart Travel chart Emerson chart Bin chart Gantt chart Travel chart Emerson chart ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management One time measurement unit (TMU) in method time measurement system equals 0.006 minute 0.0001 minute 0.0006 minute 0.001 minute 0.006 minute 0.0001 minute 0.0006 minute 0.001 minute ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The employees provident fund act is applicable to The industries notified by Government All industries other than small and medium industries Volunteers All industries The industries notified by Government All industries other than small and medium industries Volunteers All industries ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management A dummy activity Does not require any time All of the these Is represented by a dotted line Is artificially introduced Does not require any time All of the these Is represented by a dotted line Is artificially introduced ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The start or completion of task is called None of these A duration An event An activity None of these A duration An event An activity ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management In order to avoid excessive multiplication of facilities, the layout preferred is Product layout Group layout Static layout Process layout Product layout Group layout Static layout Process layout ANSWER DOWNLOAD EXAMIANS APP