Pick up the incorrect statement about advantages of work sampling

No time measuring devices are generally needed
Calculations are easier, method is economical and less time consuming
Permits a fine breakdown of activities and delays
Simultaneous study of many operators may be made by a single observer

ANSWER DOWNLOAD EXAMIANS APP

Industrial Engineering and Production Management
When slack of an activity is positive

Any one of the above
The activity is critical and any delay in its performance will delay the completion of whole project
It represents that a programme falls behind schedule and additional resources are required to complete the project in time
It represents a situation where extra resources are available and the completion of project is not delayed