Industrial Engineering and Production Management The average time recorded by work study man for an operation is called Normal time Standard time Representative time None of these Normal time Standard time Representative time None of these ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Which of the following plans motivates supervisors by paying a premium on time saved by workers? Rowan plan Halsey plan Emerson's plan Haynes plan Rowan plan Halsey plan Emerson's plan Haynes plan ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Works cost implies Factory expenses Primary cost Factory cost Primary cost + factory expenses Factory expenses Primary cost Factory cost Primary cost + factory expenses ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Work study is concerned with Motivation of workers Improving present method and finding standard time Improving production planning and control Improving production capability Motivation of workers Improving present method and finding standard time Improving production planning and control Improving production capability ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The process layout is best suited where Few number of non-standardized units is to be produced Mass production is envisaged Specialization exists Machines are arranged according to sequence of operation Few number of non-standardized units is to be produced Mass production is envisaged Specialization exists Machines are arranged according to sequence of operation ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Time study is carried out By finding all the significant informations regarding the job, work place and machine tool etc All of these By observing and recording the time taken by the operator for an operation By breaking up each operation into small elements which are measurable with the help of the measuring device accurately By finding all the significant informations regarding the job, work place and machine tool etc All of these By observing and recording the time taken by the operator for an operation By breaking up each operation into small elements which are measurable with the help of the measuring device accurately ANSWER DOWNLOAD EXAMIANS APP