Industrial Engineering and Production Management The average time recorded by work study man for an operation is called Standard time None of these Normal time Representative time Standard time None of these Normal time Representative time ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Gantt charts provide information about Production schedule Break-even point analysis Material handling layout Determining selling price Production schedule Break-even point analysis Material handling layout Determining selling price ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management In Halsey 50-50 plan, output standards are established From previous production records By time study From one's judgment All of these From previous production records By time study From one's judgment All of these ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Two alternatives can produce a product. First have a fixed cost of Rs. 2000 and a variable cost of Rs. 20 per piece. The second method has a fixed cost of Rs. 1500 and a variable cost of Rs. 30. The break even quantity between the two alternatives is 25 100 50 75 25 100 50 75 ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Work study is most useful In judging the rating of machines In improving industrial relations In judging the output of a man and improving it Where production activities are involved In judging the rating of machines In improving industrial relations In judging the output of a man and improving it Where production activities are involved ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The time by which the activity completion time can be delayed without affecting the start of succeeding activities, is known as Free float Duration Interfering float Total float Free float Duration Interfering float Total float ANSWER DOWNLOAD EXAMIANS APP