Industrial Engineering and Production Management The average time recorded by work study man for an operation is called None of these Standard time Normal time Representative time None of these Standard time Normal time Representative time ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Performance rating is equal to Observed performance - normal performance Observed performance × normal performance Observed performance + normal performance None of these Observed performance - normal performance Observed performance × normal performance Observed performance + normal performance None of these ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management 'O' on a PERT/CPM chart represents A significant event representing some milestone Dangling event An event to be transferred to other network chart An ordinary event A significant event representing some milestone Dangling event An event to be transferred to other network chart An ordinary event ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management One of the basic essentials of an incentive plan is that A differential piece rate system should exist Minimum wages should be guaranteed Provide incentive to group efficiency performance All standards should be based on time studies A differential piece rate system should exist Minimum wages should be guaranteed Provide incentive to group efficiency performance All standards should be based on time studies ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management According to Rowan plan of wage incentive system, bonus is paid to a worker On the percentage of time worked On the percentage of time saved Whose output exceeds 67% efficiency On the percentage of standard time On the percentage of time worked On the percentage of time saved Whose output exceeds 67% efficiency On the percentage of standard time ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Micro motion study is Motion study of a sequence of operations conducted systematically Study of man and machine conducted simultaneously Motion study observed on enhanced time intervals Analysis of a man-work method by using a motion picture camera with a timing device in the field of view Motion study of a sequence of operations conducted systematically Study of man and machine conducted simultaneously Motion study observed on enhanced time intervals Analysis of a man-work method by using a motion picture camera with a timing device in the field of view ANSWER DOWNLOAD EXAMIANS APP