Industrial Engineering and Production Management The average time recorded by work study man for an operation is called Standard time Normal time Representative time None of these Standard time Normal time Representative time None of these ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management In queuing theory, the nature of the waiting situation can be studied and analysed mathematically if Complete details of items in, waiting line are known Arrival and waiting times are known and can be grouped to form a waiting line model All variables and constants are known and form a linear equation The laws governing arrivals, service times, and the order in which the arriving units are taken into source are known Complete details of items in, waiting line are known Arrival and waiting times are known and can be grouped to form a waiting line model All variables and constants are known and form a linear equation The laws governing arrivals, service times, and the order in which the arriving units are taken into source are known ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management P.M.T.S. (Predetermined Motion Time Systems) include All of these W.F.S. (Work Factor Systems) M.T.M. (Method Time Measurement) M.T.S. (Basic Motion Time Study) All of these W.F.S. (Work Factor Systems) M.T.M. (Method Time Measurement) M.T.S. (Basic Motion Time Study) ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Pick up the correct statement. Dummy activity on a PERT/CPM chart means, it Consumes neither time nor resources Consumes resources but no time Is a dangling event Consumes time, but no resources Consumes neither time nor resources Consumes resources but no time Is a dangling event Consumes time, but no resources ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Scheduling Prescribes the sequence of operations to be followed Regulates the progress of job through various processes Is concerned with starting of processes Determines the programme for the operations Prescribes the sequence of operations to be followed Regulates the progress of job through various processes Is concerned with starting of processes Determines the programme for the operations ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Gantt chart provides information about the Material handling Proper utilization of manpower Efficient working of machine Production schedule Material handling Proper utilization of manpower Efficient working of machine Production schedule ANSWER DOWNLOAD EXAMIANS APP