Industrial Engineering and Production Management Which of the following are the principles of material handling? All of these Select only efficient handling equipment Keep all the handling to the minimum Move the heaviest weight to the least distance All of these Select only efficient handling equipment Keep all the handling to the minimum Move the heaviest weight to the least distance ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The basic difference between PERT and CPM is that Critical path is determined in PERT only PERT deals with events and CPM with activities Guessed times are used in PERT and evaluated times in CPM Costs are considered on CPM only and not in PERT Critical path is determined in PERT only PERT deals with events and CPM with activities Guessed times are used in PERT and evaluated times in CPM Costs are considered on CPM only and not in PERT ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Pick up the correct statement. Dummy activity on a PERT/CPM chart means, it Consumes time, but no resources Is a dangling event Consumes resources but no time Consumes neither time nor resources Consumes time, but no resources Is a dangling event Consumes resources but no time Consumes neither time nor resources ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Which of the following are the guidelines for the construction of a network diagram? Dummy activity consumes no time or resource All of the these Each activity is represented by one and only one arrow in the network Dangling must be avoided in a network diagram Dummy activity consumes no time or resource All of the these Each activity is represented by one and only one arrow in the network Dangling must be avoided in a network diagram ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The time required to complete a task is established and a bonus is paid to the worker for every hour he saves from the established time required. This type of incentive plan is known as Rowan Plan Halsey Premium plan Day work plan Taylor Differential Piece rate system Rowan Plan Halsey Premium plan Day work plan Taylor Differential Piece rate system ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The routing function in a production system design is concerned with Machine utilization Manpower utilization Optimizing material flow through the plant Quality assurance of the product Machine utilization Manpower utilization Optimizing material flow through the plant Quality assurance of the product ANSWER DOWNLOAD EXAMIANS APP