Industrial Engineering and Production Management Which of the following are the principles of material handling? Keep all the handling to the minimum Move the heaviest weight to the least distance All of these Select only efficient handling equipment Keep all the handling to the minimum Move the heaviest weight to the least distance All of these Select only efficient handling equipment ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management In CPM, the cost slope is determined by (Crash Cost - Normal cost)/ (Normal time - Crash time) Crash cost/Normal Cost (Normal cost - Crash cost)/ (Normal time - Crash time) Normal Cost/Crash cost (Crash Cost - Normal cost)/ (Normal time - Crash time) Crash cost/Normal Cost (Normal cost - Crash cost)/ (Normal time - Crash time) Normal Cost/Crash cost ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Which of the following organisation is preferred in automobile industry? Staff organisation Functional organisation Line and staff organizations Line organisation Staff organisation Functional organisation Line and staff organizations Line organisation ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Break-even analysis can be used for There is no such criterion Average of above two run analysis Long run analysis Short run analysis There is no such criterion Average of above two run analysis Long run analysis Short run analysis ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management In break even analysis, total cost consists of Fixed cost + variable cost + profit Fixed cost + variable cost Variable cost + sales revenue Fixed cost + variable cost + profit Fixed cost + variable cost Variable cost + sales revenue ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The start or completion of task is called A duration An activity None of these An event A duration An activity None of these An event ANSWER DOWNLOAD EXAMIANS APP