Industrial Engineering and Production Management In time study, the rating factor is applied to determine Merit rating of the worker Standard time of a job Fixation of incentive rate Normal time of a worker Merit rating of the worker Standard time of a job Fixation of incentive rate Normal time of a worker ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management According to MAPI formula, the old machine should be replaced by new one when(Here, CAM = Challenger's Adverse minimum, DAM = Defender's Adverse minimum) CAM > DAM CAM < DAM CAM = DAM There is no such criterion CAM > DAM CAM < DAM CAM = DAM There is no such criterion ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management In a line organization Quick decisions are taken Responsibility of each individual is fixed Discipline is strong All of these Quick decisions are taken Responsibility of each individual is fixed Discipline is strong All of these ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Micro motion study is Study of man and machine conducted simultaneously Motion study observed on enhanced time intervals Analysis of a man-work method by using a motion picture camera with a timing device in the field of view Motion study of a sequence of operations conducted systematically Study of man and machine conducted simultaneously Motion study observed on enhanced time intervals Analysis of a man-work method by using a motion picture camera with a timing device in the field of view Motion study of a sequence of operations conducted systematically ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Which of the following wage incentive plan is applied to all workers? Emerson's efficiency plan Rowan plan Gantt plan Halsey plan Emerson's efficiency plan Rowan plan Gantt plan Halsey plan ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management When slack of an activity is negative All of these It represents that a programme falls behind schedule and additional resources are required to complete the project in time The activity is critical and any delay in its performance will delay the completion of whole project It represents a situation where extra resources are available and the completion of project is not delayed All of these It represents that a programme falls behind schedule and additional resources are required to complete the project in time The activity is critical and any delay in its performance will delay the completion of whole project It represents a situation where extra resources are available and the completion of project is not delayed ANSWER DOWNLOAD EXAMIANS APP