Industrial Engineering and Production Management PERT stands for Process Estimation and Review Technique Program Evaluation and Review Technique Program Estimation and Reporting Technique Planning Estimation and Resulting Technique Process Estimation and Review Technique Program Evaluation and Review Technique Program Estimation and Reporting Technique Planning Estimation and Resulting Technique ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The simplex method is the basic method for Model analysis Value analysis Linear programming Operation research Model analysis Value analysis Linear programming Operation research ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Queuing theory deals with problems of Better utilization of man services Effective use of machines Material handling Reducing the waiting time or idle time Better utilization of man services Effective use of machines Material handling Reducing the waiting time or idle time ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Material handling in automobile industry is done by Trolley Belt conveyor Overhead crane All of these Trolley Belt conveyor Overhead crane All of these ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management In order that linear programming techniques provide valid results Relations between factors must be linear (positive) Only one factor should change at a time, others remaining constant Either (A) or (B) Relations between factors must be linear (negative) Relations between factors must be linear (positive) Only one factor should change at a time, others remaining constant Either (A) or (B) Relations between factors must be linear (negative) ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management One time measurement unit (TMU) in method time measurement system equals 0.0006 minute 0.001 minute 0.006 minute 0.0001 minute 0.0006 minute 0.001 minute 0.006 minute 0.0001 minute ANSWER DOWNLOAD EXAMIANS APP