Industrial Engineering and Production Management The unit cost in case of batch production is __________as compared to jobbing production. Low None of these High Same Low None of these High Same ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management PMTP (predetermined motion time systems) include WFS (work factor systems) All of these MTM (method time measurement) BNTS (basic motion time study) WFS (work factor systems) All of these MTM (method time measurement) BNTS (basic motion time study) ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management PERT requires None of the listed here Triple time estimate Single time estimate Double time estimate None of the listed here Triple time estimate Single time estimate Double time estimate ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The wastage of material in the store is taken into account by the following method in the evaluation of the material issued from the store Inflated system Current value method Primary cost method Fixed price method Inflated system Current value method Primary cost method Fixed price method ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Standard time is defined as Normal time + idle time + allowances Normal time + allowances Normal time + idle time Only normal time for an operation Normal time + idle time + allowances Normal time + allowances Normal time + idle time Only normal time for an operation ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Basic tool in work study is Planning chart Process chart Stop watch Planning chart Process chart Stop watch ANSWER DOWNLOAD EXAMIANS APP