Industrial Engineering and Production Management Which of the following equations is not in conformity with others? Knowledge × skill = ability Ability × motivation = performance Attitude × situation = motivation Organization performance × motivation = profits Knowledge × skill = ability Ability × motivation = performance Attitude × situation = motivation Organization performance × motivation = profits ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management When slack of an activity is negative It represents a situation where extra resources are available and the completion of project is not delayed All of these It represents that a programme falls behind schedule and additional resources are required to complete the project in time The activity is critical and any delay in its performance will delay the completion of whole project It represents a situation where extra resources are available and the completion of project is not delayed All of these It represents that a programme falls behind schedule and additional resources are required to complete the project in time The activity is critical and any delay in its performance will delay the completion of whole project ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management Gantt chart provides information about the Efficient working of machine Material handling Proper utilization of manpower Production schedule Efficient working of machine Material handling Proper utilization of manpower Production schedule ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The main objective of work measurement is to Formulate a proper incentive scheme Plan and schedule of production Estimate the selling prices and delivery dates All of these Formulate a proper incentive scheme Plan and schedule of production Estimate the selling prices and delivery dates All of these ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The time taken by a trained worker to perform an operation, while working a steady pace, is known as None of the listed here Normal time Representative time Standard time None of the listed here Normal time Representative time Standard time ANSWER DOWNLOAD EXAMIANS APP
Industrial Engineering and Production Management The probabilistic time is given by (where to = Optimistic time, tp = Pessimistic time, and tn = Most likely time) (to + tp + tn)/3 (to + 2tp + tn)/4 (to + tp + 4tn)/6 (to + 4tp + tn)/5 (to + tp + tn)/3 (to + 2tp + tn)/4 (to + tp + 4tn)/6 (to + 4tp + tn)/5 ANSWER DOWNLOAD EXAMIANS APP