MGVCL Exam Paper (30-07-2021 Shift 2)
The necessary equation to be solved during the load flow analysis using Fast-Decoupled method is given below:
where B' and B'' are formed using the imaginary part of the bus admittance matrix, Ybus. If the system consists of 6 buses of which one of the bus is slack bus and 2 bues are voltage regulated buses, then then the matrix B' is of order ____and the matrix B'' is of order____, respectivity.
∆P/|Vi| = - B'∆δ
∆Q/|Vi| = - B''∆|V|

6 and 3
5 and 3
3 and 5
3 and 6

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 2)
____are long-term (hours-long) voltage sags caused by system overload.

Voltage dips
Voltage surges
Black outs
Brownouts

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 2)
The magnitude of the generator earth-fault current is limited by

inserting the stabilizing resistance in series with the relay
using higher rating CTs
controlling field exciter
inserting suitable resistance in neutral grounding circuit

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP