MGVCL Exam Paper (30-07-2021 Shift 2)
A single phase 240 V, 1 kW heater is connected across single phase 240 V, 50 Hz supply through an SCR. For firing angle delay of 90˚, calculate the power absorbed in the heater element.

250 W
225 W
300 W
275 W

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 2)
In a power network, 400 kV is recorded at a 415 kV bus. A 50 MVAR, 415 kV shunt reactor is connected to the bus. What is the reactive power absorbed by the shunt reactor?

56.45 MVAR
76.45 MVAR
66.45 MVAR
46.45 MVAR

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 2)
નીચે માંથી ક્યાં રુઢિપ્રયોગનો અર્થ 'છેતરવું' એવો થાય

હથેળીમાં ચાંદ દેખાડવો
આડા ઉતરવું
બે પાંદડે થવું
દસ મારવો

ANSWER DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 2)
The magnitude of the generator earth-fault current is limited by

inserting the stabilizing resistance in series with the relay
controlling field exciter
inserting suitable resistance in neutral grounding circuit
using higher rating CTs

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 2)
Consider a solar PV plant with the following specific conditions: Analysis period: 1 year
Measured average solar irradiation intensity in 1 year: 120 kWh/m²
Generator area of the PV plant: 10 m²
Efficiency factor of the PV modules: 15%
Electrical energy actually exported by plant to grid: 110 kWh
Calculate the performance ratio.

0.5111
0.7111
0.6111
0.8111

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP