MGVCL Exam Paper (30-07-2021 Shift 2)
A single phase 240 V, 1 kW heater is connected across single phase 240 V, 50 Hz supply through an SCR. For firing angle delay of 90˚, calculate the power absorbed in the heater element.

275 W
300 W
225 W
250 W

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 2)
A 50 Hz synchronous generator is connected to an infinite bus through a line. The p.u. reactances of generator and the line are j0.3 p.u. and j0.2 p.u. respectively. The generator no load voltage is 1.1 p.u. and that of infinite bus is 1.0 p.u. The inertia constant of the generator is 4 MW-sec/MVA. Determine the frequency of natural oscillations if the generator is loaded to 60% of its maximum power transfer capacity and small perturbation in power is given.

1.62 Hz
1.32 Hz
1.52 Hz
1.42 Hz

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 2)
In a power network, 400 kV is recorded at a 415 kV bus. A 50 MVAR, 415 kV shunt reactor is connected to the bus. What is the reactive power absorbed by the shunt reactor?

46.45 MVAR
56.45 MVAR
76.45 MVAR
66.45 MVAR

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 2)
According to Global Wind Energy Council in 2016, India ranked____ in the Global Wind Power Installed Capacity Index with cumulative installed wind power generation.

Second
Fourth
First
Third

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 2)
નીચે માંથી ક્યાં રુઢિપ્રયોગનો અર્થ 'છેતરવું' એવો થાય

હથેળીમાં ચાંદ દેખાડવો
બે પાંદડે થવું
દસ મારવો
આડા ઉતરવું

ANSWER DOWNLOAD EXAMIANS APP