MGVCL Exam Paper (30-07-2021 Shift 2) A delta-connected balanced three-phase load is supplied from a three-phase, 400 V supply. The line current is 20 A and the power taken by the load is 10 kW. Find the power factor. 0.62 0.72 0.82 0.52 0.62 0.72 0.82 0.52 ANSWER EXPLANATION DOWNLOAD EXAMIANS APP P = 10 kWVL = 400 VIL = 20 A3- phse power, P = √3*VL*IL*cosφcosφ = 10*1000/(√3*400*20)= 0.7216
MGVCL Exam Paper (30-07-2021 Shift 2) Magnetic tape is not practical for applications where data must be quickly recalled because tape is a/an____. Random access medium Sequential access medium expensive storage medium None of these Random access medium Sequential access medium expensive storage medium None of these ANSWER DOWNLOAD EXAMIANS APP
MGVCL Exam Paper (30-07-2021 Shift 2) In a synchronous motor with field under excited, the power factor will be zero unity lagging leading zero unity lagging leading ANSWER EXPLANATION DOWNLOAD EXAMIANS APP For synchronous motor,Under excitation - Lagging power factorOver excitation - Leading power factorFor synchronous generatorUnder excitation - Leading power factorOver excitation - lagging power factor
MGVCL Exam Paper (30-07-2021 Shift 2) Transistors were used in ____ of Computers. Third Generation Fourth Generation Second Generation First Generation Third Generation Fourth Generation Second Generation First Generation ANSWER DOWNLOAD EXAMIANS APP
MGVCL Exam Paper (30-07-2021 Shift 2) Which of the following is a national organisation monitoring the doping control programme in sports in India? Primary Anti-Doping Agency Indian Anti-Doping Agency International Anti-Doping Protocol National Anti-Doping Agency Primary Anti-Doping Agency Indian Anti-Doping Agency International Anti-Doping Protocol National Anti-Doping Agency ANSWER DOWNLOAD EXAMIANS APP
MGVCL Exam Paper (30-07-2021 Shift 2) Which one of the following is the largest windfarm located in India? Vindhayachal Muppandal Mundra Talcher Vindhayachal Muppandal Mundra Talcher ANSWER EXPLANATION DOWNLOAD EXAMIANS APP Rank - Windfarm name - Capacity1 - Muppandal windfarm - 1500 MW2 - Jaisalmer Wind Park - 1064 MW3 - Brahmanvel Wind Farm Dhule - 964 MW4 - Damanjodi Wind Farm - 99 MW5 - Tuppadahalli Wind Farm - 56.1 MW