MGVCL Exam Paper (30-07-2021 Shift 2)
A three-phase 400 V, 6-pole, 50 Hz squirrel-cage induction motor is running at a slip of 5%. The speed of rotor with respect to stator magnetic field and speed of the stator magnetic field with respect to rotor magnetic field are

950 rpm, zero
-50 rpm, 1000 rpm
950 rpm, 1000 rpm
-50 rpm, zero

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 2)
The necessary equation to be solved during the load flow analysis using Fast-Decoupled method is given below:
where B' and B'' are formed using the imaginary part of the bus admittance matrix, Ybus. If the system consists of 6 buses of which one of the bus is slack bus and 2 bues are voltage regulated buses, then then the matrix B' is of order ____and the matrix B'' is of order____, respectivity.
∆P/|Vi| = - B'∆δ
∆Q/|Vi| = - B''∆|V|

3 and 6
3 and 5
6 and 3
5 and 3

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 2)
According to Global Wind Energy Council in 2016, India ranked____ in the Global Wind Power Installed Capacity Index with cumulative installed wind power generation.

Fourth
Second
Third
First

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 2)
A 50 Hz synchronous generator is connected to an infinite bus through a line. The p.u. reactances of generator and the line are j0.3 p.u. and j0.2 p.u. respectively. The generator no load voltage is 1.1 p.u. and that of infinite bus is 1.0 p.u. The inertia constant of the generator is 4 MW-sec/MVA. Determine the frequency of natural oscillations if the generator is loaded to 60% of its maximum power transfer capacity and small perturbation in power is given.

1.42 Hz
1.52 Hz
1.62 Hz
1.32 Hz

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP

MGVCL Exam Paper (30-07-2021 Shift 2)
Which one of the following statement with respect to Aerial Bunched Cables (ABC) system is TRUE?

ABC system requires more clearance, insulators and high maintenance.
The overall cost of the ABC system is very high as compared to the bare conductor system.
ABC system totally eliminates the fault on lines and thereby improving the quality of supply.
ABC system is not suitable for rural electrification which are situated in difficult terrain, hills, forests and coastal areas.

ANSWER EXPLANATION DOWNLOAD EXAMIANS APP