Railway Engineering The main function of a fish plate is To allow rail to expand and contract freely To join the two rails together To join rails with the sleeper None of these To allow rail to expand and contract freely To join the two rails together To join rails with the sleeper None of these ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering Number of keys used in CST-9 sleeper is None of these 3 4 2 None of these 3 4 2 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering For a sleeper density of (n+5), the number of sleepers required for constructing a broad gauge railway track of length 650 m is 963 975 900 985 963 975 900 985 ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering The width of foot for 90 R rail section is 136.5 mm 100 mm 146.0 mm 122.2 mm 136.5 mm 100 mm 146.0 mm 122.2 mm ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering For a 8° curve track diverging from a main curve of 5° in an opposite direction in the layout of a broad gauge yard, the cant to be provided for the branch track for maximum speed of 45 km/h on the main line and ‘G’ = 1.676 m is (Permitted cant deficiency for the main line = 7.6 cm) 7.432 cm -0.168 cm 0.168 cm 7.768 cm 7.432 cm -0.168 cm 0.168 cm 7.768 cm ANSWER DOWNLOAD EXAMIANS APP
Railway Engineering A triangle is used for Separating all the sidings and shunting lines from main lines Transferring wagons to and from parallel tracks without shunting Changing the direction of engine Preventing the vehicles from running off the track Separating all the sidings and shunting lines from main lines Transferring wagons to and from parallel tracks without shunting Changing the direction of engine Preventing the vehicles from running off the track ANSWER DOWNLOAD EXAMIANS APP