Building Construction The local swelling of a finished plaster, is termed Blistering Cracking Hacking Dubbing Blistering Cracking Hacking Dubbing ANSWER DOWNLOAD EXAMIANS APP
Building Construction Number of vertical joints in a stretcher course is x times the number of joints in the header course, where x is equal to 1 1/2 1/4 2 1 1/2 1/4 2 ANSWER DOWNLOAD EXAMIANS APP
Building Construction In ordinary residential and public buildings, the damp proof course is generally provided at Midway ground level and water-table level Ground level Plinth level Water table level Midway ground level and water-table level Ground level Plinth level Water table level ANSWER DOWNLOAD EXAMIANS APP
Building Construction The ceiling height of a building is Upto roof above ground level Between ceiling and ground level Between ceiling and floor level Upto ceiling from the ground level Upto roof above ground level Between ceiling and ground level Between ceiling and floor level Upto ceiling from the ground level ANSWER DOWNLOAD EXAMIANS APP
Building Construction In any good staircase, the maximum and minimum pitch respectively should be 60° and 10° 90° and 0° 40° and 25° 75° and 30° 60° and 10° 90° and 0° 40° and 25° 75° and 30° ANSWER DOWNLOAD EXAMIANS APP
Building Construction In high mountainous region, the type of roof generally recommended for buildings, is Gable type Mansard type Gambrel type Shed type Gable type Mansard type Gambrel type Shed type ANSWER DOWNLOAD EXAMIANS APP