Building Construction The local swelling of a finished plaster, is termed Dubbing Hacking Cracking Blistering Dubbing Hacking Cracking Blistering ANSWER DOWNLOAD EXAMIANS APP
Building Construction The mortar in which both cement and lime are used as binding materials, is called Fire resistant mortar Gauged mortar Lime mortar Cement mortar Fire resistant mortar Gauged mortar Lime mortar Cement mortar ANSWER DOWNLOAD EXAMIANS APP
Building Construction The window which is provided in flat roof of a room, is known Lantern window Sky window Louvered window Dormer window Lantern window Sky window Louvered window Dormer window ANSWER DOWNLOAD EXAMIANS APP
Building Construction The foundations are placed below ground level, to increase Workability Strength Stability of structure All listed here Workability Strength Stability of structure All listed here ANSWER DOWNLOAD EXAMIANS APP
Building Construction The highest line of sloping roof, where two opposite slopes meet, is known as Crown Rafter Ridge Eave Crown Rafter Ridge Eave ANSWER DOWNLOAD EXAMIANS APP
Building Construction The maximum total settlement for raft foundation on clayey soils should be limited to 25 mm 25 to 40 mm 65 to 100 mm 40 to 65 mm 25 mm 25 to 40 mm 65 to 100 mm 40 to 65 mm ANSWER DOWNLOAD EXAMIANS APP