Building Construction The local swelling of a finished plaster, is termed Blistering Hacking Dubbing Cracking Blistering Hacking Dubbing Cracking ANSWER DOWNLOAD EXAMIANS APP
Building Construction The form work from the sides of beams can be removed only after 1 day 7 days 14 days 4 days 1 day 7 days 14 days 4 days ANSWER DOWNLOAD EXAMIANS APP
Building Construction The form work from the underside of slabs, can be removed only after 14 days 7 days 1 day 4 days 14 days 7 days 1 day 4 days ANSWER DOWNLOAD EXAMIANS APP
Building Construction Negative skin friction Neither (A) not (B) Is a downward drag acting on a pile due to downward movement of the surrounding compressible soil relative to the pile Develops due to lowering of ground water Both (A) and (B) Neither (A) not (B) Is a downward drag acting on a pile due to downward movement of the surrounding compressible soil relative to the pile Develops due to lowering of ground water Both (A) and (B) ANSWER DOWNLOAD EXAMIANS APP
Building Construction For brick construction, the lime-sand mortar, is 1 : 1 1 : 2 1 : 3 1 : 4 1 : 1 1 : 2 1 : 3 1 : 4 ANSWER DOWNLOAD EXAMIANS APP
Building Construction The minimum thickness of walls built in cement mortar (1 : 6) for a single storey building, is 15 cm 25 cm 20 cm 10 cm 15 cm 25 cm 20 cm 10 cm ANSWER DOWNLOAD EXAMIANS APP