Building Construction The local swelling of a finished plaster, is termed Hacking Cracking Dubbing Blistering Hacking Cracking Dubbing Blistering ANSWER DOWNLOAD EXAMIANS APP
Building Construction The form work from the underside of slabs, can be removed only after 1 day 7 days 4 days 14 days 1 day 7 days 4 days 14 days ANSWER DOWNLOAD EXAMIANS APP
Building Construction The minimum distance between the centers of bulb of diameter du, of a multi under reamed piles, is 1.35 du 1.75 du 1.25 du 1.5 du 1.35 du 1.75 du 1.25 du 1.5 du ANSWER DOWNLOAD EXAMIANS APP
Building Construction The process of keeping concrete moist for a certain period after its finishing, is known as Placing of concrete Curing of concrete Finishing of concrete Compaction of concrete Placing of concrete Curing of concrete Finishing of concrete Compaction of concrete ANSWER DOWNLOAD EXAMIANS APP
Building Construction In any good staircase, the maximum and minimum pitch respectively should be 60° and 10° 40° and 25° 90° and 0° 75° and 30° 60° and 10° 40° and 25° 90° and 0° 75° and 30° ANSWER DOWNLOAD EXAMIANS APP
Building Construction The loose pockets in soil mass can be bridged safely by providing a raft foundation provided the soft area is smaller than Three-fourth the column spacing One-third the column spacing The column spacing Half the column spacing Three-fourth the column spacing One-third the column spacing The column spacing Half the column spacing ANSWER DOWNLOAD EXAMIANS APP