Building Construction A wooden block hinged on post outside a door, is known Stop None of these Horn Cleat Stop None of these Horn Cleat ANSWER DOWNLOAD EXAMIANS APP
Building Construction A floor constructed with 3 mm marble chips, is known Chips floor Marble floor Terrazzo floor Mosaic floor Chips floor Marble floor Terrazzo floor Mosaic floor ANSWER DOWNLOAD EXAMIANS APP
Building Construction The stone whose crushing strength is least, is Marble Slate Chalk Granite Marble Slate Chalk Granite ANSWER DOWNLOAD EXAMIANS APP
Building Construction The bearing capacity of granite is generally 15 to 20 kg/cm² 5 to 10 kg/cm² 40 to 45 kg/cm² 30 to 35 kg/cm² 15 to 20 kg/cm² 5 to 10 kg/cm² 40 to 45 kg/cm² 30 to 35 kg/cm² ANSWER DOWNLOAD EXAMIANS APP
Building Construction The form work from the sides of beams can be removed only after 4 days 1 day 7 days 14 days 4 days 1 day 7 days 14 days ANSWER DOWNLOAD EXAMIANS APP
Building Construction The angle between skew back of a flat arch and the horizontal, is kept approximately equal to 30° 90° 60° 0° 30° 90° 60° 0° ANSWER DOWNLOAD EXAMIANS APP