Building Construction

Building Construction
A wooden block hinged on post outside a door, is known

None of these
Cleat
Stop
Horn

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The arrangement of supporting an existing structure by providing supports underneath, is known as

Piling
Jacking
Underpinning
Shoring

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
In case of Raymond pile

Diameter of top of piles varies from 40 cm to 60 cm
All listed here
Diameter of pile at bottom varies from 20 cm to 28 cm
Lengths vary from 6 m to 12 m

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The concrete slump recommended for foundations, is

25 to 50 mm
30 to 125 mm
75 to 125 mm
50 to 100 mm

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
The form Work including the props can be removed from beams, only after

14 days
21 days
3 days
7 days

ANSWER DOWNLOAD EXAMIANS APP

Building Construction
In case of multi-storeyed buildings, the forms to be removed first are

Column forms
Sides of beams and girders
All the above at the same time
Bottom of beams and girders

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Building Construction

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑