Power Systems The load duration curve for a system is 8 hours 30 MW, 16 hours 25 MW and 24 hours 20 MW. The load factor will be 0.44. 0.25. 0.83. 1.3. 0.44. 0.25. 0.83. 1.3. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which one of the following relays has the capability of anticipating the possible major fault in a transformer? Buchholz relay Over current relay Over fluxing relay Differential relay Buchholz relay Over current relay Over fluxing relay Differential relay ANSWER DOWNLOAD EXAMIANS APP
Power Systems If L and C are 4 mH and 0.0001 μF respectively a current chop of magnitude 50 Amp would induced a voltage 400 kV. 200 kV. 100 kV. 50 kV. 400 kV. 200 kV. 100 kV. 50 kV. ANSWER DOWNLOAD EXAMIANS APP
Power Systems If the rated receiving end voltage is 33 kV, then what are the limits for safe operation of equipments? 25 to 35 kV 31.35 to 34.65 kV 33 to 50 kV any voltage above 33 kV 25 to 35 kV 31.35 to 34.65 kV 33 to 50 kV any voltage above 33 kV ANSWER DOWNLOAD EXAMIANS APP
Power Systems MCB stands for maximum capacity breaker. molded circuit breaker. minimum capacity breaker. miniature circuit breaker. maximum capacity breaker. molded circuit breaker. minimum capacity breaker. miniature circuit breaker. ANSWER DOWNLOAD EXAMIANS APP
Power Systems In which of the following given faults, all the sequence currents are equal? LLL LLG LG LL LLL LLG LG LL ANSWER DOWNLOAD EXAMIANS APP