Power Systems The load duration curve for a system is 8 hours 30 MW, 16 hours 25 MW and 24 hours 20 MW. The load factor will be 0.25. 1.3. 0.83. 0.44. 0.25. 1.3. 0.83. 0.44. ANSWER DOWNLOAD EXAMIANS APP
Power Systems India 1st nuclear plant was set up at Bhaba. Tarapur. Rana pratap sagar. Kalpakkam. Bhaba. Tarapur. Rana pratap sagar. Kalpakkam. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Telecommunication lines are transposed to reduce the All of these efficiency voltage level radio interference in communication lines All of these efficiency voltage level radio interference in communication lines ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following relationships are not valid for short transmission lines A = D = 1 B = C = Z Is = Ir All of these A = D = 1 B = C = Z Is = Ir All of these ANSWER DOWNLOAD EXAMIANS APP
Power Systems A power station plant load factor is defined as the ratio of minimum load to peak load minimum load to average load average load to the peak load the energy generated to that of maximum energy that could have been generated minimum load to peak load minimum load to average load average load to the peak load the energy generated to that of maximum energy that could have been generated ANSWER DOWNLOAD EXAMIANS APP
Power Systems The use of high speed circuit breakers reduces the short circuit current. increased the short circuit current. improves system stability. decrease system stability. reduces the short circuit current. increased the short circuit current. improves system stability. decrease system stability. ANSWER DOWNLOAD EXAMIANS APP