Power Systems The load duration curve for a system is 8 hours 30 MW, 16 hours 25 MW and 24 hours 20 MW. The load factor will be 0.44. 1.3. 0.25. 0.83. 0.44. 1.3. 0.25. 0.83. ANSWER DOWNLOAD EXAMIANS APP
Power Systems India’s largest thermal power station is located at Neyveli. Chandrapur. Kota. Sarni. Neyveli. Chandrapur. Kota. Sarni. ANSWER DOWNLOAD EXAMIANS APP
Power Systems With reference to hydrometer station, the graphical representation of the discharge as function of time is known as Monograph. Hectograph. Hydro-graph. Load duration curve. Monograph. Hectograph. Hydro-graph. Load duration curve. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A generator has a rating of 10 MVA, 5 kV has a reactance of 0.02 pu. Find the reactance at a new base values of 50 MVA, 10 kV? 0.02 0.05 0.25 0.025 0.02 0.05 0.25 0.025 ANSWER DOWNLOAD EXAMIANS APP
Power Systems If the inertia constant H = 10 MJ/MVA for a 50 MVA generator, the stored energy is 500 MJ 10 MJ 5 MJ 50 MJ 500 MJ 10 MJ 5 MJ 50 MJ ANSWER DOWNLOAD EXAMIANS APP
Power Systems If sparsity of a 5 bus transmission line is 0.4. Find the number of transmission lines? 4 6 3 5 4 6 3 5 ANSWER DOWNLOAD EXAMIANS APP