Power Systems A hydro power plant of run off river type should be provided with pondage so that the operating head is controlled. firm capacity of plant is increased. pressure inside the turbine casing remains. kinetic energy of the running water is fully utilized. operating head is controlled. firm capacity of plant is increased. pressure inside the turbine casing remains. kinetic energy of the running water is fully utilized. ANSWER DOWNLOAD EXAMIANS APP
Power Systems IF the time of operation of a relay for unity TMS is 10 sec then the time of operation for 0.5 TMS is 5 sec. 10 sec. none of these. 20 sec. 5 sec. 10 sec. none of these. 20 sec. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following statement is/are true regarding infinite line? It has infinite voltage It maintains the constant voltage both 2 and 3 It has infinite length It has infinite voltage It maintains the constant voltage both 2 and 3 It has infinite length ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of following power plants will take long period in erection and installation Nuclear. Gas turbine. Hydro Power Plant Thermal. Nuclear. Gas turbine. Hydro Power Plant Thermal. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Stock bridge dampers are used in case hill areas to over come the which problem? increase power factor increase string efficiency unequal ice loading All of these increase power factor increase string efficiency unequal ice loading All of these ANSWER DOWNLOAD EXAMIANS APP
Power Systems The water from a catchment is 60*106 cu m annually and hydro station has head of 40 m. Assuming ideal generator and turbine, the power that can be theoretically generated is 750 kW 500 kW 250 kW 300 kW 750 kW 500 kW 250 kW 300 kW ANSWER DOWNLOAD EXAMIANS APP