Power Systems A hydro power plant of run off river type should be provided with pondage so that the pressure inside the turbine casing remains. firm capacity of plant is increased. operating head is controlled. kinetic energy of the running water is fully utilized. pressure inside the turbine casing remains. firm capacity of plant is increased. operating head is controlled. kinetic energy of the running water is fully utilized. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of following generating plants has the minimum operating cost Nuclear plant. Steam plant. Diesel plant. Hydroelectric plant. Nuclear plant. Steam plant. Diesel plant. Hydroelectric plant. ANSWER DOWNLOAD EXAMIANS APP
Power Systems For harnessing low variable water heads, the suitable hydraulic turbine with high percentage of reaction and runner adjust vanes is Francis. Kaplan. Pelton. Impeller. Francis. Kaplan. Pelton. Impeller. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Keeping in view the cost and overall effectiveness, the following circuit breaker is best suited for capacitor bank switching? Air blast CB. SF6 CB. Oil CB. Vacuum CB. Air blast CB. SF6 CB. Oil CB. Vacuum CB. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A power station has a maximum demand of 15000 kW. The annual load factor is 50% and plant capacity factor is 40%. What is the reserve capacity of the plant? 7500 kW 6000 kW 3750 kW 3000 kW 7500 kW 6000 kW 3750 kW 3000 kW ANSWER DOWNLOAD EXAMIANS APP
Power Systems Range of accelerating factor is 50 to 100 10.8 to 11.2 1 to 10 1.6 to 1.8 50 to 100 10.8 to 11.2 1 to 10 1.6 to 1.8 ANSWER DOWNLOAD EXAMIANS APP