Power Systems A hydro power plant of run off river type should be provided with pondage so that the kinetic energy of the running water is fully utilized. firm capacity of plant is increased. pressure inside the turbine casing remains. operating head is controlled. kinetic energy of the running water is fully utilized. firm capacity of plant is increased. pressure inside the turbine casing remains. operating head is controlled. ANSWER DOWNLOAD EXAMIANS APP
Power Systems For harnessing low variable water heads, the suitable hydraulic turbine with high percentage of reaction and runner adjust vanes is Kaplan. Francis. Impeller. Pelton. Kaplan. Francis. Impeller. Pelton. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following is/are the methods of improving transient stability? Fast acting governing system Fast acting excitation control All of these Dynamic breaking Fast acting governing system Fast acting excitation control All of these Dynamic breaking ANSWER DOWNLOAD EXAMIANS APP
Power Systems The charging reactance of 50 km transmission line is 1500 Ω. What is the charging reactance for 100 km length of line? 1500 Ω 1000 Ω 3000 Ω 750 Ω 1500 Ω 1000 Ω 3000 Ω 750 Ω ANSWER DOWNLOAD EXAMIANS APP
Power Systems Critical mass of the fuel is the amount required to make the multiplication factor more than 1. less than 1. equal to factor. 0.5. more than 1. less than 1. equal to factor. 0.5. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A 3-phase transmission line operating at Vs = 400 kV and has ABCD parameters A= D = 0.8∠0°, B = 100∠90° Ω, C = 0.5*10^-6∠90° ℧. Find the shunt reactor required for compensating ferranti effect? 500 Ω 3000 Ω 2000 Ω 1500 Ω 500 Ω 3000 Ω 2000 Ω 1500 Ω ANSWER DOWNLOAD EXAMIANS APP