Power Systems A hydro power plant of run off river type should be provided with pondage so that the kinetic energy of the running water is fully utilized. firm capacity of plant is increased. operating head is controlled. pressure inside the turbine casing remains. kinetic energy of the running water is fully utilized. firm capacity of plant is increased. operating head is controlled. pressure inside the turbine casing remains. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Communications lines are treated as any of the above long transmission lines short transmission lines medium transmission lines any of the above long transmission lines short transmission lines medium transmission lines ANSWER DOWNLOAD EXAMIANS APP
Power Systems Find the surge impedance of a line when inductance is 160 mH and capacitance is 1µF? 400 Ω 200 Ω 160 Ω 800 Ω 400 Ω 200 Ω 160 Ω 800 Ω ANSWER DOWNLOAD EXAMIANS APP
Power Systems A thermal power plant is being supplied with coal having much more ash content than that for which it was designed. Which of its following units needs major modifications Pulversing unit. Condenser. Ash handling unit. Cooling tower. Pulversing unit. Condenser. Ash handling unit. Cooling tower. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Taking the density of water to be 1000 kg/m³, how much power would be developed by a hydro electric generator unit, assume 100% efficiency, with 1 m head and 1 m³/s discharge? 19.60 kW 9.81 kW 2.90 kW 4.45 kW 19.60 kW 9.81 kW 2.90 kW 4.45 kW ANSWER DOWNLOAD EXAMIANS APP
Power Systems Zero sequence currents can flow from a line into a transformer bank if the windings are in delta / delta. star / grounded star. ground star / delta. delta / star. delta / delta. star / grounded star. ground star / delta. delta / star. ANSWER DOWNLOAD EXAMIANS APP