Power Systems A hydro power plant of run off river type should be provided with pondage so that the firm capacity of plant is increased. pressure inside the turbine casing remains. kinetic energy of the running water is fully utilized. operating head is controlled. firm capacity of plant is increased. pressure inside the turbine casing remains. kinetic energy of the running water is fully utilized. operating head is controlled. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The steam power plant efficiency can be improved by using large quantity of water. decreasing the load on the plant. burning large amount of coal. using high temperature and high pressure steam. using large quantity of water. decreasing the load on the plant. burning large amount of coal. using high temperature and high pressure steam. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following transformer is used in sub station for operating a protective relay? All of these auto transformer capacitor voltage transformer distribution transformer All of these auto transformer capacitor voltage transformer distribution transformer ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following materials is/are used as moderators? beryllium graphite heavy water All of these beryllium graphite heavy water All of these ANSWER DOWNLOAD EXAMIANS APP
Power Systems When is the ferranti effect on long overhead lines experienced? The power factor is unity The line is heavily loaded The line is fully loaded The line is lightly loaded The power factor is unity The line is heavily loaded The line is fully loaded The line is lightly loaded ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of following power plants will take long period in erection and installation Hydro Power Plant Gas turbine. Thermal. Nuclear. Hydro Power Plant Gas turbine. Thermal. Nuclear. ANSWER DOWNLOAD EXAMIANS APP