Power Systems A hydro power plant of run off river type should be provided with pondage so that the pressure inside the turbine casing remains. kinetic energy of the running water is fully utilized. firm capacity of plant is increased. operating head is controlled. pressure inside the turbine casing remains. kinetic energy of the running water is fully utilized. firm capacity of plant is increased. operating head is controlled. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of following power plants normally operage at high speeds Thermal. Petrol engine. Diesel engine. Hydro electric. Thermal. Petrol engine. Diesel engine. Hydro electric. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following power plants needs highly skilled/qualified engineers for its operation Gas-turbine. Hydro Power Plant Thermal. Nuclear. Gas-turbine. Hydro Power Plant Thermal. Nuclear. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The charging current of a 400 kV line is more than that of a 220 kV line of the same length? None of these either 1 or 2 False True None of these either 1 or 2 False True ANSWER DOWNLOAD EXAMIANS APP
Power Systems Sum of the elements of row i equal to shunt admittances connected to bus i. If this summation is zero, indicates there is no None of these shunt admittance both 1 and 2 mutual coupling None of these shunt admittance both 1 and 2 mutual coupling ANSWER DOWNLOAD EXAMIANS APP
Power Systems Where the voltage is high and current to be interrupted is low, Which of following the breaker is preferable? Oil CB. Any of these. Vacuum CB. Air blast CB. Oil CB. Any of these. Vacuum CB. Air blast CB. ANSWER DOWNLOAD EXAMIANS APP