Power Systems A hydro power plant of run off river type should be provided with pondage so that the pressure inside the turbine casing remains. kinetic energy of the running water is fully utilized. operating head is controlled. firm capacity of plant is increased. pressure inside the turbine casing remains. kinetic energy of the running water is fully utilized. operating head is controlled. firm capacity of plant is increased. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Switchgear equipment include switches. fuses. relays and CB. all of these. switches. fuses. relays and CB. all of these. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following will take least time in starting from cold condition to full load operation Nuclear power plant. Hydro electric power plant. Gas turbine plant. Thermal power plant. Nuclear power plant. Hydro electric power plant. Gas turbine plant. Thermal power plant. ANSWER DOWNLOAD EXAMIANS APP
Power Systems The load duration curve for a system is 8 hours 30 MW, 16 hours 25 MW and 24 hours 20 MW. The load factor will be 0.25. 0.44. 0.83. 1.3. 0.25. 0.44. 0.83. 1.3. ANSWER DOWNLOAD EXAMIANS APP
Power Systems High capacity generators and motors are of delta connected network star connected with grounding network any of the above star connected network delta connected network star connected with grounding network any of the above star connected network ANSWER DOWNLOAD EXAMIANS APP
Power Systems Earthing switch is used for measuring of safety voltage All of these protection of equipment from ground faults discharging residual energies measuring of safety voltage All of these protection of equipment from ground faults discharging residual energies ANSWER DOWNLOAD EXAMIANS APP