Power Systems Surge impedance loading (SIL) is represented by Vph²/Zs Vl²*√(C/L) Vl²/Zs both 1 and 2 Vph²/Zs Vl²*√(C/L) Vl²/Zs both 1 and 2 ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following are the fissile materials U238 and Th232. U235, U233 and Pu239. None of these. U235 and Th239. U238 and Th232. U235, U233 and Pu239. None of these. U235 and Th239. ANSWER DOWNLOAD EXAMIANS APP
Power Systems When is the ferranti effect on long overhead lines experienced? The line is fully loaded The line is heavily loaded The power factor is unity The line is lightly loaded The line is fully loaded The line is heavily loaded The power factor is unity The line is lightly loaded ANSWER DOWNLOAD EXAMIANS APP
Power Systems Keeping in view the cost and overall effectiveness, the following circuit breaker is suited for capacitor bank switching vacuum. oil. SF6. air blast. vacuum. oil. SF6. air blast. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Efficiency of thermal power plant can be taken as product of efficiencies of all stages. efficiency of thermal cycle. generator efficiency. turbine efficiency. product of efficiencies of all stages. efficiency of thermal cycle. generator efficiency. turbine efficiency. ANSWER DOWNLOAD EXAMIANS APP
Power Systems A gas turbine power plant is best suited for None of these. Peak load. Emergency. Base load. None of these. Peak load. Emergency. Base load. ANSWER DOWNLOAD EXAMIANS APP