Surveying The flying height of the camera is 1,000 m above mean ground level, the distance of the top of a building from a nadir point is 10 cm and the relief displacement of building is 7.2 mm. The height of the building, is 82 m 62 m 52 m 72 m 82 m 62 m 52 m 72 m ANSWER DOWNLOAD EXAMIANS APP
Surveying The chord of a curve less than peg interval, is known as Small chord Short chord Sub-chord Normal chord Small chord Short chord Sub-chord Normal chord ANSWER DOWNLOAD EXAMIANS APP
Surveying The main object of the astronomer to obtain Astronomical bearing Astronomical latitude All of these Astronomical longitude Astronomical bearing Astronomical latitude All of these Astronomical longitude ANSWER DOWNLOAD EXAMIANS APP
Surveying For mapping any country Primary triangles are broken down into secondary triangles of somewhat lesser accuracy All listed here Geodetic triangulation of greatest possible sides and accuracy is carried out Secondary triangles are further broken into third and fourth order triangles, the points of which are used for detail surveys Primary triangles are broken down into secondary triangles of somewhat lesser accuracy All listed here Geodetic triangulation of greatest possible sides and accuracy is carried out Secondary triangles are further broken into third and fourth order triangles, the points of which are used for detail surveys ANSWER DOWNLOAD EXAMIANS APP
Surveying The process of turning the telescope about the vertical axis in horizontal plane is known as transiting plunging reversing swinging transiting plunging reversing swinging ANSWER DOWNLOAD EXAMIANS APP
Surveying The altitude of a heavenly body is its angular distance, measured on the vertical circle passing through the body, above Pole Horizon None of these Equator Pole Horizon None of these Equator ANSWER DOWNLOAD EXAMIANS APP