Surveying If in a closed traverse, the sum of the north latitudes is more than the sum of the south latitudes and also the sum of west departures is more than the sum of the east departures, the bearing of the closing line is in the SW quadrant SE quadrant NE quadrant NW quadrant SW quadrant SE quadrant NE quadrant NW quadrant ANSWER DOWNLOAD EXAMIANS APP
Surveying After fixing the plane table to the tripod, the main operations which are needed at each plane table station are(i) Levelling(ii) Orientation(iii) CenteringThe correct sequence of these operations is (i), (ii), (iii) (iii), (i), (ii) (ii), (iii), (i) (i), (iii), (ii) (i), (ii), (iii) (iii), (i), (ii) (ii), (iii), (i) (i), (iii), (ii) ANSWER DOWNLOAD EXAMIANS APP
Surveying The declination and right ascension of the sun becomes 23° 27' S and 270° respectively on December 22 September 21 March 21 June 21 December 22 September 21 March 21 June 21 ANSWER DOWNLOAD EXAMIANS APP
Surveying To obtain photographs of an area of 1000 m average elevation, on scale 1 : 30,000, with a camera of 30 cm focal length, the flying height is 7000 m 5000 m 6000 m 4000 m 7000 m 5000 m 6000 m 4000 m ANSWER DOWNLOAD EXAMIANS APP
Surveying The time interval between successive transits of the moon, is 20 hours 25 minutes 24 hours 50 minutes 23 hours 50 minutes 24 hours 10 minutes 20 hours 25 minutes 24 hours 50 minutes 23 hours 50 minutes 24 hours 10 minutes ANSWER DOWNLOAD EXAMIANS APP
Surveying The correction for parallax, is + 8".8 cos α - 8".8 cos α - 8".8 cos α + .8" sin α + 8".8 cos α - 8".8 cos α - 8".8 cos α + .8" sin α ANSWER DOWNLOAD EXAMIANS APP