Power Systems The flow duration curve at a given head of a hydroelectric plant is used to determine total units of energy available. total power available at the site. load factory at the plant. diversity factor for the plant. total units of energy available. total power available at the site. load factory at the plant. diversity factor for the plant. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Merze price current scheme protection is used in transformer. alternator. both A and B. bus bars. transformer. alternator. both A and B. bus bars. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following is/are the desirable properties of a insulator material? High relative permittivity Low ratio of puncture strength to flash over. High ratio of puncture strength to flash over. Both 1 and 2 High relative permittivity Low ratio of puncture strength to flash over. High ratio of puncture strength to flash over. Both 1 and 2 ANSWER DOWNLOAD EXAMIANS APP
Power Systems A thermal generating station has an installed capacity of 15 MW and supplies a daily load of 10 MW for 12 hours and 5 MW for remaining 12 hours. The plant capacity factor for the station is 0.75 0.6 0.5 1 0.75 0.6 0.5 1 ANSWER DOWNLOAD EXAMIANS APP
Power Systems For n bus power system size of Y bus matrix is (n-1)×(n-1) (n-1)×(n-2) n×n (n-2)×(n-2) (n-1)×(n-1) (n-1)×(n-2) n×n (n-2)×(n-2) ANSWER DOWNLOAD EXAMIANS APP
Power Systems Find the number of insulator discs required in string insulator, if operating voltage is 220 kV and maximum voltage of each disc is 11 kV? 20 21 10 13 20 21 10 13 ANSWER DOWNLOAD EXAMIANS APP