Power Systems What are the methods of laying underground cables? Both A and B. Draw - in - system / duct - pipe laying. None of these. Direct laying. Both A and B. Draw - in - system / duct - pipe laying. None of these. Direct laying. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following relays is/are unit protection relays? Buccholz relays both 1 and 2 over current relays Differential relays Buccholz relays both 1 and 2 over current relays Differential relays ANSWER DOWNLOAD EXAMIANS APP
Power Systems The per unit value of a 2 ohm resistor at 100 MVA and 10 kV base voltage is 0.5 pu 2 pu 4 pu 0.2 pu 0.5 pu 2 pu 4 pu 0.2 pu ANSWER DOWNLOAD EXAMIANS APP
Power Systems Which of the following is/are advantages of N-R method? Time taken for each iteration is less Applicable for large power system network Number of iterations are less both 1 and 2 Time taken for each iteration is less Applicable for large power system network Number of iterations are less both 1 and 2 ANSWER DOWNLOAD EXAMIANS APP
Power Systems The load current in short circuit calculations are neglected because short circuit currents are greatly out of phase with load currents nether 1 nor 2 short circuit currents are much larger than load currents both 1 and 2 short circuit currents are greatly out of phase with load currents nether 1 nor 2 short circuit currents are much larger than load currents both 1 and 2 ANSWER DOWNLOAD EXAMIANS APP
Power Systems Pumped storage plant is a peak load plant both 1 and 2 None of these base load plant peak load plant both 1 and 2 None of these base load plant ANSWER DOWNLOAD EXAMIANS APP