Power Systems What are the methods of laying underground cables? Draw - in - system / duct - pipe laying. None of these. Both A and B. Direct laying. Draw - in - system / duct - pipe laying. None of these. Both A and B. Direct laying. ANSWER DOWNLOAD EXAMIANS APP
Power Systems If the penalty factor of a plant is unity, its incremental transmission loss is None of these 1 0 -1 None of these 1 0 -1 ANSWER DOWNLOAD EXAMIANS APP
Power Systems A 200 MW capacity generator has a speed regulation of 4% for a frequency drop of 0.05 Hz. Find the power input supplied by the turbine for maintaining constant frequency? 5 MW 20 MW 15 MW 10 MW 5 MW 20 MW 15 MW 10 MW ANSWER DOWNLOAD EXAMIANS APP
Power Systems What are the tests performed for oil-filled and gas-filled cables ? Thermal stability test. Load cycle tests. Impulse tests. All of these. Thermal stability test. Load cycle tests. Impulse tests. All of these. ANSWER DOWNLOAD EXAMIANS APP
Power Systems In an induction relay for a particular current setting the operating time 4 sec. When the time multiplier setting is 0.8 if the time multiplier setting is rest to 1 the operating time is 5. 10. 1. un changed. 5. 10. 1. un changed. ANSWER DOWNLOAD EXAMIANS APP
Power Systems Galvanised steel is generally used as stray wire. earth wire. structural components. All of these stray wire. earth wire. structural components. All of these ANSWER DOWNLOAD EXAMIANS APP